Do you have any question about this error?
Message type: E = Error
Message class: /SAPAPO/PPM_MAINTAIN -
Message number: 519
Message text: Modes with same primary resource in activity &1 &2
Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.
To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.
Unfortunately, there isn't any extra information in this error notice.
First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).
Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.
You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.
/SAPAPO/PPM_MAINTAIN519
- Modes with same primary resource in activity &1 &2 ?The SAP error message
/SAPAPO/PPM_MAINTAIN519
indicates that there is a conflict in the planning process due to multiple modes being assigned to the same primary resource in an activity. This typically occurs in the context of Production Planning and Detailed Scheduling (PP/DS) within SAP Advanced Planning and Optimization (APO).Cause:
The error arises when:
To resolve this error, you can take the following steps:
Review Activity Configuration:
Adjust Mode Assignment:
Check Resource Settings:
Re-schedule Activities:
Consult Documentation:
/SAPAPO/PPM
for planning and maintenance activities.By following these steps, you should be able to resolve the error and ensure that your planning activities proceed without conflicts.
Get instant SAP help. Start your 7-day free trial now.
/SAPAPO/PPM_MAINTAIN518
Activity &1 &2 is its own successor
What causes this issue? A relationship has been created for the activity specified. The relationship refers to itself. This is not allowed.System Res...
/SAPAPO/PPM_MAINTAIN517
Activity network is not complete
What causes this issue? The activity network does not include all activities of the PPM.System Response The system issues an error message and will ...
/SAPAPO/PPM_MAINTAIN520
Setup act. &1 &2 contains a prim. res. (mode &3) not equal to type SINGLE
What causes this issue? In the mode specified, the setup activity contains a primary resource of a type other than SINGLE.System Response The system...
/SAPAPO/PPM_MAINTAIN521
Activity &1 &2 in mode &3 contains primary resource without setup matrix
What causes this issue? The setup activity works with a setup matrix, but in the mode specified, it contains a primary resource for which no setup ma...