How To Fix /SAPAPO/PPM_GENERATE233 - &1 plan is invalid on generation date


/SAPAPO/PPM_GENERATE233 - Overview

  • Message type: E = Error

  • Message class: /SAPAPO/PPM_GENERATE -

  • Message number: 233

  • Message text: &1 plan is invalid on generation date

  • Show details Hide details


  • Self-Explanatory Message

    Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.

    To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.

    Unfortunately, there isn't any extra information in this error notice.



    What else can you do?

    First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).

    Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.

    You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.


Smart SAP Assistant

  • What is the cause and solution for SAP error message /SAPAPO/PPM_GENERATE233 - &1 plan is invalid on generation date ?
    The SAP error message /SAPAPO/PPM_GENERATE233 indicates that a planning plan is invalid on the specified generation date. This error typically occurs in the context of SAP Advanced Planning and Optimization (APO) when trying to generate or execute a planning run for a plan that is not valid for the given date.
    Causes:
    
    Invalid Plan Version: The plan version you are trying to use may not be active or valid for the specified date.
    Date Range Issues: The generation date may fall outside the valid date range for the planning plan.
    Master Data Issues: There may be missing or incorrect master data (like product, location, etc.) that is required for the planning run.
    
    Configuration Issues: The planning area or planning version may not be properly configured or activated. Data Locking: There may be data locks in place that prevent the plan from being generated. Solutions: Check Plan Version: Verify that the plan version you are using is active and

    Already have an account? Login here!




Instant HelpGet instant SAP help. Sign up for our Free Essentials Plan.


Related SAP Error Messages

Click the links below to see the following related messages:

Click on this link to search all SAP messages.


Rating
ERPlingo's SAP support assistant is amazing. Saves me countless hours trying to solve complex SAP issues myself. It's a real game changer!
Rate 1
Thomas Michael
SAP Consultant, Author & Speaker