Message type: E = Error
Message class: /SAPAPO/PPM_GENERATE -
Message number: 230
Message text: Plan &1: Start date for generation period is in the past
Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.
To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.
Unfortunately, there isn't any extra information in this error notice.
First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).
Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.
You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.
/SAPAPO/PPM_GENERATE230
- Plan &1: Start date for generation period is in the past ?The SAP error message /SAPAPO/PPM_GENERATE230 indicates that there is an issue with the planning process in SAP Advanced Planning and Optimization (APO). Specifically, the error states that the start date for the generation period is in the past, which means that the system is trying to generate a plan for a time frame that has already elapsed.
Cause: Incorrect Date Settings: The start date for the planning generation period has been set to a date that is earlier than the current date.
Configuration Issues: The planning parameters or settings may not be configured correctly, leading to the generation period being defined incorrectly. Data Entry Errors: Manual entry of dates may have led to an incorrect start date being specified.
Solution: Check the Planning Parameters: Go to the planning book or the relevant transaction where the planning parameters are defined. Verify the start date for the generation period and ensure it is set to a future date. Adjust the Generation
Get instant SAP help. Sign up for our Free Essentials Plan.
/SAPAPO/PPM_GENERATE229
&1 plan(s) changed
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
/SAPAPO/PPM_GENERATE228
Scope too large; limit your selection further
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
/SAPAPO/PPM_GENERATE231
Plan &1: Start date set to start of next bucket
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
/SAPAPO/PPM_GENERATE232
&1 plan changed
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
Click on this link to search all SAP messages.