Do you have any question about this error?
Message type: E = Error
Message class: /SAPAPO/PPM_GENERATE -
Message number: 123
Message text: The start date has been set at the beginning of the next bucket
Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.
To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.
Unfortunately, there isn't any extra information in this error notice.
First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).
Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.
You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.
/SAPAPO/PPM_GENERATE123
- The start date has been set at the beginning of the next bucket ?The SAP error message
/SAPAPO/PPM_GENERATE123
indicates that there is an issue with the scheduling of a planning process in SAP Advanced Planning and Optimization (APO). Specifically, the error states that "The start date has been set at the beginning of the next bucket," which typically means that the system is trying to schedule a planning activity to start at a time that is not aligned with the defined planning buckets (time intervals) in your planning environment.Cause:
- Bucket Configuration: The planning buckets may not be configured correctly, or the start date of the planning activity is set to a time that does not align with the defined bucket intervals.
- Planning Horizon: The planning horizon may not include the specified start date, leading to the scheduling issue.
- Data Entry Error: There may be an error in the data entry for the planning activity, such as an incorrect start date or time.
- Master Data Issues: There could be issues with the master data, such as incorrect settings for the product or location that affect the planning process.
Solution:
- Check Bucket Settings: Review the configuration of your planning buckets in the APO system. Ensure that the start date of the planning activity aligns with the defined bucket intervals.
- Adjust Start Date: Modify the start date of the planning activity to fall within the current bucket or the last bucket of the planning horizon.
- Review Planning Horizon: Ensure that the planning horizon is set correctly and includes the start date of the planning activity.
- Validate Master Data: Check the master data for the relevant product and location to ensure that all settings are correct and consistent with the planning process.
- Consult Documentation: Refer to SAP documentation or help resources for specific details on bucket configuration and planning settings.
Related Information:
/SAPAPO/PPM
to access the planning process management or /SAPAPO/MC62
to check the bucket settings.By following these steps, you should be able to identify and resolve the issue causing the error message /SAPAPO/PPM_GENERATE123
.
Get instant SAP help. Start your 7-day free trial now.
/SAPAPO/PPM_GENERATE122
No temporary order could be created for lot size &1 &2
What causes this issue? The system was unable to create a <DS:GLOS.C09B558D0497D511B1250008C784EFB1>temporary PP/DS order</> for lot size...
/SAPAPO/PPM_GENERATE121
No valid mode combination exists for the PP/DS plan
What causes this issue? No valid mode combination exists for the PP/DS plan due to the mode priority restriction.System Response The system could no...
/SAPAPO/PPM_GENERATE124
Start date of the generation period is in the past
What causes this issue? As the start date of the generation period is in the past, the system is not able to create the <DS:GLOS.C09B558D0497D511B...
/SAPAPO/PPM_GENERATE125
Mode combination used is no longer valid
What causes this issue? You have entered SNP PPM generation modes from the PP/DS plan that no longer exist due to subsequent changes made to the PP/D...
Click on this link to search all SAP messages.