Message type: E = Error
Message class: /SAPAPO/PPM_GENERATE -
Message number: 116
Message text: Multi-mixed resource &1 not dimensionless
Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.
To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.
Unfortunately, there isn't any extra information in this error notice.
First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).
Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.
You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.
/SAPAPO/PPM_GENERATE116
- Multi-mixed resource &1 not dimensionless ?The SAP error message
/SAPAPO/PPM_GENERATE116
indicates that there is an issue with a multi-mixed resource in the SAP Advanced Planning and Optimization (APO) module. Specifically, the error states that the resource is not dimensionless, which means that the system expects the resource to be defined in a way that does not depend on specific dimensions (like time, quantity, etc.).Cause:
- Resource Configuration: The resource in question may not be configured correctly in the system. Multi-mixed resources should be dimensionless, meaning they should not have any specific units of measure associated with them.
- Planning Object Structure: The planning object structure may not be set up correctly, leading to inconsistencies in how resources are defined and utilized.
- Data Inconsistencies: There may be inconsistencies in the master data related to the resource, such as incorrect settings in the resource master data or in the production process.
Solution:
Check Resource Configuration:
- Go to the resource master data in SAP APO and verify the settings for the multi-mixed resource. Ensure that it is defined as dimensionless.
- If necessary, adjust the configuration to remove any specific dimensions or units of measure.
Review Planning Object Structure:
- Check the planning object structure to ensure that it is correctly set up to handle multi-mixed resources. Make sure that the resource is included in the appropriate planning object.
Validate Master Data:
- Review the master data for the resource and ensure that all relevant fields are correctly filled out. Look for any discrepancies or missing information that could lead to this error.
- If you find any issues, correct them and re-run the planning process.
Consult Documentation:
- Refer to SAP documentation or help resources for more detailed information on configuring multi-mixed resources and troubleshooting related errors.
Testing:
- After making the necessary changes, perform a test run of the planning process to ensure that the error has been resolved.
Related Information:
If the issue persists after following these steps, it may be beneficial to consult with an SAP expert or your organization's SAP support team for further assistance.
Get instant SAP help. Start your 7-day free trial now.
/SAPAPO/PPM_GENERATE115
No plans earmarked for generation found
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
/SAPAPO/PPM_GENERATE114
Maximum number of mode combinations exceeded
What causes this issue? You defined a maximum number for SNP plans generated. This number should not be exceeded but during generation of the mode co...
/SAPAPO/PPM_GENERATE117
No bottleneck resource exists in PP/DS plan
What causes this issue? When determining the campaign profile, it is mandatory for there to be exactly one bottleneck resource in the plan. In this P...
/SAPAPO/PPM_GENERATE118
Several bottleneck resources exist in PP/DS plan
What causes this issue? When determining the campaign profile, it is mandatory for there to be exactly one bottleneck resource in the plan. In this P...
Click on this link to search all SAP messages.