How To Fix /SAPAPO/PP_OPTIMIZER430 - Missing Quantity After Lead Time Analysis (Horizons): &1%


SAP Error Message - Details

  • Message type: E = Error

  • Message class: /SAPAPO/PP_OPTIMIZER -

  • Message number: 430

  • Message text: Missing Quantity After Lead Time Analysis (Horizons): &1%

  • Show details Hide details


  • Self-Explanatory Message

    Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.

    To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.

    Unfortunately, there isn't any extra information in this error notice.



    What else can you do?

    First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).

    Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.

    You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.


Smart SAP Assistant

  • What is the cause and solution for SAP error message /SAPAPO/PP_OPTIMIZER430 - Missing Quantity After Lead Time Analysis (Horizons): &1% ?

    The SAP error message /SAPAPO/PP_OPTIMIZER430 Missing Quantity After Lead Time Analysis (Horizons): &1% typically occurs in the context of the SAP Advanced Planning and Optimization (APO) module, particularly when using the PP/DS (Production Planning/Detailed Scheduling) optimizer. This error indicates that there is a discrepancy in the quantities that are expected to be available after considering lead times during the planning horizon.

    Cause:

    1. Lead Time Configuration: The lead times for production or procurement may not be correctly configured. If the lead times are set incorrectly, the optimizer may not be able to allocate the required quantities within the specified time frame.

    2. Insufficient Stock: There may not be enough stock available to meet the demand after considering the lead times. This can happen if the demand is higher than the supply or if there are unexpected delays in production or procurement.

    3. Planning Horizon Issues: The planning horizon may not be set appropriately. If the horizon is too short, the optimizer may not have enough time to fulfill the demand.

    4. Data Inconsistencies: There may be inconsistencies in the master data, such as incorrect product master data, location data, or resource data.

    5. Demand and Supply Mismatch: The demand forecast may not align with the supply capabilities, leading to a situation where the optimizer cannot fulfill the demand.

    Solution:

    1. Review Lead Time Settings: Check the lead time settings for the relevant products and ensure they are configured correctly. Adjust the lead times if necessary.

    2. Check Stock Levels: Analyze the current stock levels and ensure that they are sufficient to meet the demand. If stock levels are low, consider adjusting production schedules or procurement plans.

    3. Adjust Planning Horizon: Review and, if necessary, extend the planning horizon to ensure that the optimizer has enough time to plan for the required quantities.

    4. Validate Master Data: Ensure that all relevant master data (product, location, resource) is accurate and up to date. Correct any inconsistencies found.

    5. Analyze Demand and Supply: Review the demand and supply plans to identify any mismatches. Adjust forecasts or production plans as needed to align demand with supply capabilities.

    6. Run the Optimizer Again: After making the necessary adjustments, rerun the optimizer to see if the issue is resolved.

    Related Information:

    • Transaction Codes: You may use transaction codes like /SAPAPO/OPTIMIZER to access the optimizer settings and configurations.
    • SAP Notes: Check for any relevant SAP Notes that may address this specific error or provide additional troubleshooting steps.
    • Documentation: Refer to the SAP APO documentation for detailed information on lead time analysis and the optimizer's configuration.

    If the issue persists after following these steps, it may be beneficial to consult with your SAP support team or a consultant who specializes in SAP APO for further assistance.

    • Do you have any question about this error?


      Upgrade now to chat with this error.


Instant HelpGet instant SAP help. Start your 7-day free trial now.


Related SAP Error Messages

Click the links below to see the following related messages:

Click on this link to search all SAP messages.


Rating
The AI Support Assistant is great. It provides comprehensive assistance even on the most difficult issues. I highly recommend this service.
Rate 1
John Jordan
SAP Consultant & Author