How To Fix /SAPAPO/PP_OPTIMIZER410 - Lead time analysis: Priority &1


SAP Error Message - Details

  • Message type: E = Error

  • Message class: /SAPAPO/PP_OPTIMIZER -

  • Message number: 410

  • Message text: Lead time analysis: Priority &1

  • Show details Hide details


  • Self-Explanatory Message

    Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.

    To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.

    Unfortunately, there isn't any extra information in this error notice.



    What else can you do?

    First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).

    Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.

    You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.


Smart SAP Assistant

  • What is the cause and solution for SAP error message /SAPAPO/PP_OPTIMIZER410 - Lead time analysis: Priority &1 ?

    The SAP error message /SAPAPO/PP_OPTIMIZER410 Lead time analysis: Priority &1 typically occurs in the context of the SAP Advanced Planning and Optimization (APO) module, particularly when using the PP/DS (Production Planning and Detailed Scheduling) optimizer. This message indicates an issue related to lead time analysis during the optimization process.

    Cause:

    The error message is generally triggered when the optimizer encounters a problem with the priority assigned to a specific production order or planning object. The priority value (&1) indicates the specific priority level that is causing the issue. This can happen due to several reasons, including:

    1. Invalid Priority Settings: The priority assigned to the production order may not be valid or may not exist in the system.
    2. Configuration Issues: There may be configuration issues in the APO system related to lead time analysis or priority settings.
    3. Data Inconsistencies: There could be inconsistencies in the master data, such as product master, location master, or resource master, which affect the lead time calculations.
    4. Resource Constraints: The optimizer may be unable to allocate resources based on the given priority due to constraints or capacity issues.

    Solution:

    To resolve the error, you can take the following steps:

    1. Check Priority Settings:

      • Verify the priority settings in the system. Ensure that the priority value indicated in the error message is valid and correctly configured in the system.
      • You can check the priority settings in the transaction code /SAPAPO/OPTIMIZER or through the relevant customizing settings.
    2. Review Master Data:

      • Check the master data for the affected product, including the product master, location master, and resource master. Ensure that all relevant data is correctly maintained and consistent.
      • Look for any missing or incorrect lead time settings in the product master.
    3. Analyze Resource Availability:

      • Review the resource availability and capacity settings. Ensure that the resources required for production are available and not over-allocated.
      • Check for any maintenance or downtime that may affect resource availability.
    4. Run the Optimizer with Different Settings:

      • If the issue persists, try running the optimizer with different settings or priorities to see if the problem is specific to certain configurations.
    5. Consult SAP Notes:

      • Check the SAP Support Portal for any relevant SAP Notes or patches that may address this specific error message or related issues.
    6. Contact SAP Support:

      • If you are unable to resolve the issue, consider reaching out to SAP Support for further assistance. Provide them with the error message details and any relevant logs or screenshots.

    Related Information:

    • Transaction Codes: Familiarize yourself with relevant transaction codes such as /SAPAPO/OPTIMIZER, /SAPAPO/SDP94, and /SAPAPO/MC90 for monitoring and analyzing planning runs.
    • Documentation: Review the SAP documentation for APO and PP/DS to understand the configuration and settings related to lead time analysis and priority management.
    • Training: Consider training sessions or workshops on SAP APO to enhance your understanding of the system and its functionalities.

    By following these steps, you should be able to identify and resolve the issue related to the error message /SAPAPO/PP_OPTIMIZER410 Lead time analysis: Priority &1.

    • Do you have any question about this error?


      Upgrade now to chat with this error.


Instant HelpGet instant SAP help. Start your 7-day free trial now.


Related SAP Error Messages

Click the links below to see the following related messages:

Click on this link to search all SAP messages.


Rating
ERPlingo's SAP support assistant is amazing. Saves me countless hours trying to solve complex SAP issues myself. It's a real game changer!
Rate 1
Thomas Michael
SAP Consultant, Author & Speaker