How To Fix /SAPAPO/PP_OPTIMIZER407 - Capacity analysis: Priority &1


SAP Error Message - Details

  • Message type: E = Error

  • Message class: /SAPAPO/PP_OPTIMIZER -

  • Message number: 407

  • Message text: Capacity analysis: Priority &1

  • Show details Hide details


  • Self-Explanatory Message

    Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.

    To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.

    Unfortunately, there isn't any extra information in this error notice.



    What else can you do?

    First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).

    Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.

    You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.


Smart SAP Assistant

  • What is the cause and solution for SAP error message /SAPAPO/PP_OPTIMIZER407 - Capacity analysis: Priority &1 ?

    The SAP error message /SAPAPO/PP_OPTIMIZER407 with the description "Capacity analysis: Priority &1" typically occurs in the context of SAP Advanced Planning and Optimization (APO) when there is an issue related to capacity planning and resource allocation.

    Cause:

    This error message generally indicates that there is a problem with the priority assigned to a specific production order or activity. The priority value (&1) is likely not valid or is causing a conflict in the capacity analysis process. This can happen due to several reasons, including:

    1. Invalid Priority Value: The priority assigned to the order may not be recognized by the system or may be outside the acceptable range.
    2. Capacity Constraints: The system may be unable to allocate the required capacity due to existing constraints or conflicts with other orders.
    3. Configuration Issues: There may be issues with the configuration of the planning parameters or resource settings in the APO system.

    Solution:

    To resolve the error, you can take the following steps:

    1. Check Priority Settings:

      • Verify the priority value assigned to the production order or activity. Ensure that it is within the acceptable range defined in the system.
      • If necessary, adjust the priority value to a valid one.
    2. Review Capacity Planning:

      • Analyze the capacity situation for the resources involved. Check if there are any existing orders or activities that are consuming the capacity and causing conflicts.
      • Use the Capacity Planning tools in APO to get a better understanding of the resource utilization.
    3. Adjust Resource Configuration:

      • Review the configuration settings for the resources in the APO system. Ensure that they are set up correctly to handle the planned orders.
      • Check for any changes in the resource availability or settings that may have occurred recently.
    4. Consult Documentation:

      • Refer to SAP documentation or notes related to the /SAPAPO/PP_OPTIMIZER407 error for any specific recommendations or patches that may address the issue.
    5. Contact SAP Support:

      • If the issue persists after checking the above points, consider reaching out to SAP support for further assistance. Provide them with detailed information about the error, including the context in which it occurred.

    Related Information:

    • SAP Notes: Check for any relevant SAP Notes that may provide additional insights or solutions for this specific error.
    • Transaction Codes: Familiarize yourself with transaction codes related to capacity planning and production order management in SAP APO, such as /SAPAPO/CC01 (Capacity Check) and /SAPAPO/OPTIMIZER (Optimizer).
    • Training and Documentation: Consider reviewing training materials or documentation on SAP APO and capacity planning to better understand how priorities and capacity are managed within the system.

    By following these steps, you should be able to identify the root cause of the error and implement a solution to resolve it.

    • Do you have any question about this error?


      Upgrade now to chat with this error.


Instant HelpGet instant SAP help. Start your 7-day free trial now.


Related SAP Error Messages

Click the links below to see the following related messages:

Click on this link to search all SAP messages.


Rating
The AI Support Assistant is great. It provides comprehensive assistance even on the most difficult issues. I highly recommend this service.
Rate 1
John Jordan
SAP Consultant & Author