Do you have any question about this error?
Message type: E = Error
Message class: /SAPAPO/PP_OPTIMIZER -
Message number: 287
Message text: Fixed partial problem cannot be solved
Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.
To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.
Unfortunately, there isn't any extra information in this error notice.
First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).
Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.
You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.
/SAPAPO/PP_OPTIMIZER287
- Fixed partial problem cannot be solved ?The SAP error message
/SAPAPO/PP_OPTIMIZER287
indicates that the optimizer encountered a situation where it could not solve a fixed partial problem. This typically occurs in the context of Advanced Planning and Optimization (APO) in SAP, particularly when using the Production Planning (PP) Optimizer.Causes:
- Infeasible Constraints: The constraints defined in the planning run may be conflicting or infeasible, making it impossible for the optimizer to find a solution.
- Data Issues: There may be issues with master data, such as incorrect or missing data for resources, products, or production versions.
- Capacity Constraints: If the capacity of resources is not sufficient to meet the demand, the optimizer may fail to find a feasible solution.
- Incorrect Settings: The settings in the optimizer profile or planning parameters may not be configured correctly, leading to issues during optimization.
- Fixed Orders: If there are fixed orders or fixed production quantities that cannot be adjusted, it may lead to infeasibility in the optimization process.
Solutions:
- Review Constraints: Check the constraints defined in the planning run. Ensure that they are realistic and do not conflict with each other.
- Validate Master Data: Ensure that all relevant master data (materials, resources, production versions) is complete and accurate. Look for any missing or incorrect entries.
- Check Capacity: Review the capacity of resources to ensure they can meet the planned production. Adjust capacity or production schedules as necessary.
- Adjust Optimizer Settings: Review the optimizer profile and planning parameters. Make adjustments to settings that may be causing the issue.
- Analyze Fixed Orders: If there are fixed orders, analyze whether they can be adjusted or if additional capacity is needed to accommodate them.
- Run a Simplified Model: If possible, try running a simplified version of the model to identify specific constraints or data issues causing the problem.
Related Information:
/SAPAPO/OPTIMIZER
to access the optimizer settings and profiles.If the issue persists after trying the above solutions, it may be beneficial to consult with SAP support or a technical consultant who specializes in SAP APO.
Get instant SAP help. Start your 7-day free trial now.
/SAPAPO/PP_OPTIMIZER286
Fixed partial problem cannot be solved
What causes this issue? There are fixed orders at location &V1& that trigger issues of material &V2&. In a bucket with no activities ...
/SAPAPO/PP_OPTIMIZER285
Infeasible problem
What causes this issue? A problem that cannot be analyzed has been set to the optimizer; this problem cannot be solved. The reasons for infeasibility...
/SAPAPO/PP_OPTIMIZER293
A duplicate key exists in table &3
What causes this issue? This pair (ARCID = &V1&, MATID = &V2&) appears in table &V3& more than once.How to fix this error? C...
/SAPAPO/PP_OPTIMIZER294
Table &3: Referential integrity violated
What causes this issue? This pair (ARCID = &V1&, MATID = &V2&) of table &V3& does not exist as a key of table ET_ARCMAT.How t...
Click on this link to search all SAP messages.