Do you have any question about this error?
Message type: E = Error
Message class: /SAPAPO/PP_OPTIMIZER -
Message number: 211
Message text: Priority &1 for product &2 is ignored
Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.
To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.
Unfortunately, there isn't any extra information in this error notice.
First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).
Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.
You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.
/SAPAPO/PP_OPTIMIZER211
- Priority &1 for product &2 is ignored ?The SAP error message
/SAPAPO/PP_OPTIMIZER211
indicates that a specific priority setting for a product is being ignored during the optimization process in SAP Advanced Planning and Optimization (APO). This typically occurs in the context of production planning and scheduling.Cause:
The error message is triggered when the priority assigned to a product is not applicable or cannot be considered in the current planning scenario. This can happen for several reasons, including:
- Invalid Priority Value: The priority value assigned to the product may not be valid or recognized by the system.
- Planning Parameters: The planning parameters or settings may not allow for the consideration of product priorities.
- Product Status: The product may be in a status that does not allow for prioritization (e.g., discontinued, inactive).
- Resource Constraints: If there are resource constraints or other planning conflicts, the optimizer may ignore the priority to fulfill other planning requirements.
- Configuration Issues: There may be configuration issues in the APO system that prevent the priority from being applied correctly.
Solution:
To resolve this error, you can take the following steps:
- Check Priority Settings: Verify the priority settings for the product in question. Ensure that the priority value is valid and correctly configured in the system.
- Review Planning Parameters: Check the planning parameters in the APO system to ensure that they allow for the consideration of product priorities.
- Product Status: Confirm that the product is active and eligible for planning. If the product is inactive or discontinued, consider updating its status.
- Analyze Resource Constraints: Review the resource constraints and other planning factors that may be affecting the optimization process. Adjust them if necessary to allow for priority consideration.
- Configuration Review: If the issue persists, review the configuration settings in the APO system. Ensure that all relevant settings are correctly configured to allow for priority handling.
- Consult Documentation: Refer to SAP documentation or support notes related to the
/SAPAPO/PP_OPTIMIZER211
message for additional insights and troubleshooting steps.Related Information:
By following these steps, you should be able to identify the cause of the error and implement a solution to ensure that product priorities are correctly considered in the optimization process.
Get instant SAP help. Start your 7-day free trial now.
/SAPAPO/PP_OPTIMIZER207
Product &1 at transportation lane &2: Discrete constraints violated
What causes this issue? Due to the profile settings for unsuccessful solution determination, discrete constraints were removed to enable a solution t...
/SAPAPO/PP_OPTIMIZER206
Production process model/PDS &1: Discrete constraints violated
What causes this issue? Due to the profile settings for unsuccessful solution determination, discrete constraints were removed to enable a solution t...
/SAPAPO/PP_OPTIMIZER214
Location &1, prod. &2: rcpt lower bound is greater than rcpt upper bound
What causes this issue? In period &V3&, you have defined a receipt lower bound that is larger than the corresponding receipt upper bound.Syst...
/SAPAPO/PP_OPTIMIZER215
Location &1, product &2: negative receipt upper or lower bound
What causes this issue? You have defined negative receipt upper or lower bounds in period &V3&.System Response The optimization run is cance...
Click on this link to search all SAP messages.