How To Fix /SAPAPO/PP_OPTIMIZER171 - Product &1 at location &2: External procurement of larger qty costs less


SAP Error Message - Details

  • Message type: E = Error

  • Message class: /SAPAPO/PP_OPTIMIZER -

  • Message number: 171

  • Message text: Product &1 at location &2: External procurement of larger qty costs less

  • Show details Hide details


  • Self-Explanatory Message

    Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.

    To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.

    Unfortunately, there isn't any extra information in this error notice.



    What else can you do?

    First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).

    Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.

    You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.


Smart SAP Assistant

  • What is the cause and solution for SAP error message /SAPAPO/PP_OPTIMIZER171 - Product &1 at location &2: External procurement of larger qty costs less ?

    The SAP error message /SAPAPO/PP_OPTIMIZER171 indicates that there is a discrepancy in the cost structure for a product at a specific location. Specifically, it suggests that external procurement of a larger quantity is more cost-effective than producing the product internally. This message typically arises during the planning process in SAP Advanced Planning and Optimization (APO) when the optimizer is evaluating the cost of production versus external procurement.

    Cause:

    1. Cost Structure: The cost of producing the product internally may be higher than the cost of procuring it externally, especially when considering economies of scale.
    2. Lot Size Settings: The lot size settings in the planning parameters may not be optimized, leading to inefficient production runs.
    3. Master Data Issues: There may be incorrect or outdated master data related to costs, such as material master records, vendor pricing, or procurement info records.
    4. Planning Strategy: The planning strategy used for the product may not align with the actual cost structure, leading to suboptimal planning decisions.

    Solution:

    1. Review Costing: Analyze the cost structure for both internal production and external procurement. Ensure that the cost data is accurate and up-to-date.
    2. Adjust Lot Sizes: Consider adjusting the lot size settings in the planning parameters to better reflect the optimal production quantities.
    3. Update Master Data: Check and update the material master records, vendor pricing, and procurement info records to ensure they reflect the current cost situation.
    4. Evaluate Planning Strategy: Review the planning strategy assigned to the product and consider whether it needs to be changed to better align with the cost structure.
    5. Run the Optimizer Again: After making the necessary adjustments, run the optimizer again to see if the issue is resolved.

    Related Information:

    • Transaction Codes: You may need to use transaction codes like /SAPAPO/OPTIMIZER to access the optimizer settings or /SAPAPO/MC90 for planning book settings.
    • Costing Views: Check the costing views in the material master (MM03) to ensure that the cost estimates are accurate.
    • APO Configuration: Review the configuration settings in APO related to procurement and production planning to ensure they are set up correctly.
    • Documentation: Refer to SAP documentation or help notes for more detailed information on the specific error message and its implications.

    By addressing the underlying causes and implementing the suggested solutions, you should be able to resolve the error message and optimize your planning process effectively.

    • Do you have any question about this error?


      Upgrade now to chat with this error.


Instant HelpGet instant SAP help. Start your 7-day free trial now.


Related SAP Error Messages

Click the links below to see the following related messages:

Click on this link to search all SAP messages.


Rating
The AI Support Assistant is great. It provides comprehensive assistance even on the most difficult issues. I highly recommend this service.
Rate 1
John Jordan
SAP Consultant & Author