Message type: E = Error
Message class: /SAPAPO/PP_OPTIMIZER -
Message number: 150
Message text: Resource &1: Are costs for capacity increase ok?
Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.
To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.
Unfortunately, there isn't any extra information in this error notice.
First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).
Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.
You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.
/SAPAPO/PP_OPTIMIZER150
- Resource &1: Are costs for capacity increase ok? ?The SAP error message /SAPAPO/PP_OPTIMIZER150 typically occurs in the context of the SAP Advanced Planning and Optimization (APO) module, specifically when using the PP/DS (Production Planning and Detailed Scheduling) optimizer. This error message indicates that there is a question regarding the costs associated with increasing the capacity of a resource.
Cause: The error message is triggered when the optimizer encounters a situation where it needs to evaluate whether the costs associated with increasing the capacity of a resource are acceptable. This can happen due to several reasons: Capacity Constraints: The optimizer is trying to allocate production orders to resources that are currently at or near their capacity limits. Cost Settings: The cost settings for increasing capacity may not be properly defined or may be set to values that the optimizer cannot process. Resource Configuration: The resource in question may not be configured correctly in terms of its capacity, costs, or availability. Planning Parameters: The planning parameters
Get instant SAP help. Sign up for our Free Essentials Plan.
/SAPAPO/PP_OPTIMIZER149
Production process model/PDS &1 at location &2: Are costs ok?
What causes this issue? You modeled the costs for executing PPM &V1& at location &V2& with a piecewise linear cost function, but sele...
/SAPAPO/PP_OPTIMIZER148
Product &1 at transportation lane &2: Are transportation costs ok?
What causes this issue? You used a piecewise linear function to model the costs for transporting product &V1& on transportation lane &V2&...
/SAPAPO/PP_OPTIMIZER151
Product &1 at location &2: External procurement cost function incomplete
What causes this issue? The piecewise linear cost function to procure product &V1& externally at location &V2& has been defined for a...
/SAPAPO/PP_OPTIMIZER152
Product &1 at transportation lane &2: Incomplete transportn cost function
What causes this issue? The piecewise linear cost function for transporting product &V1& on transportation lane &V2& was only defined...
Click on this link to search all SAP messages.