How To Fix /SAPAPO/PP_OPTIMIZER150 - Resource &1: Are costs for capacity increase ok?


/SAPAPO/PP_OPTIMIZER150 - Overview

  • Message type: E = Error

  • Message class: /SAPAPO/PP_OPTIMIZER -

  • Message number: 150

  • Message text: Resource &1: Are costs for capacity increase ok?

  • Show details Hide details


  • Self-Explanatory Message

    Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.

    To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.

    Unfortunately, there isn't any extra information in this error notice.



    What else can you do?

    First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).

    Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.

    You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.


Smart SAP Assistant

  • What is the cause and solution for SAP error message /SAPAPO/PP_OPTIMIZER150 - Resource &1: Are costs for capacity increase ok? ?
    The SAP error message /SAPAPO/PP_OPTIMIZER150 typically occurs in the context of the SAP Advanced Planning and Optimization (APO) module, specifically when using the PP/DS (Production Planning and Detailed Scheduling) optimizer. This error message indicates that there is a question regarding the costs associated with increasing the capacity of a resource.
    
    Cause: The error message is triggered when the optimizer encounters a situation where it needs to evaluate whether the costs associated with increasing the capacity of a resource are acceptable. This can happen due to several reasons: Capacity Constraints: The optimizer is trying to allocate production orders to resources that are currently at or near their capacity limits. Cost Settings: The cost settings for increasing capacity may not be properly defined or may be set to values that the optimizer cannot process. Resource Configuration: The resource in question may not be configured correctly in terms of its capacity, costs, or availability. Planning Parameters: The planning parameters

    Already have an account? Login here!




Instant HelpGet instant SAP help. Sign up for our Free Essentials Plan.


Related SAP Error Messages

Click the links below to see the following related messages:

Click on this link to search all SAP messages.


Rating
The AI Support Assistant is great. It provides comprehensive assistance even on the most difficult issues. I highly recommend this service.
Rate 1
John Jordan
SAP Consultant & Author