Message type: E = Error
Message class: /SAPAPO/PMAN -
Message number: 008
Message text: Different capacity requirements after backward and forward scheduling
Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.
To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.
Unfortunately, there isn't any extra information in this error notice.
First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).
Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.
You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.
/SAPAPO/PMAN008
- Different capacity requirements after backward and forward scheduling ?The SAP error message /SAPAPO/PMAN008 indicates that there are different capacity requirements after performing backward and forward scheduling in the Advanced Planning and Optimization (APO) module. This typically occurs when the scheduling logic results in discrepancies between the capacity requirements calculated for backward scheduling and those calculated for forward scheduling.
Cause: Different Scheduling Logic: Backward and forward scheduling may use different logic or parameters, leading to variations in capacity requirements. Capacity Constraints: If there are constraints on resources (like limited capacity or availability), the scheduling methods may yield different results. Production Versions: Different production versions or routing configurations may be applied during backward and forward scheduling. Resource Availability: Changes in resource availability or capacity during the scheduling process can lead to discrepancies. Time Periods: The time periods considered for scheduling may differ, affecting the capacity requirements.
Solution: Check Scheduling Parameters: Review the scheduling parameters and settings in the APO system to ensure they are consistent for both backward
Get instant SAP help. Sign up for our Free Essentials Plan.
/SAPAPO/PMAN007
Select objects for one order only
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
/SAPAPO/PMAN006
Select one line only
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
/SAPAPO/PMAN009
No data found in critical path (float) - Internal error
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
/SAPAPO/PMAN010
Heuristic is not for orders with sequence-dependent setup activities
What causes this issue? The heuristic for calculating the critical path found orders with sequence-dependent setup activities. Because the heuristic ...