Do you have any question about this error?
Message type: E = Error
Message class: /SAPAPO/PFCS_MESS -
Message number: 028
Message text: Current period not used (min. work days = &1, current = &2)
Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.
To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.
Unfortunately, there isn't any extra information in this error notice.
First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).
Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.
You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.
/SAPAPO/PFCS_MESS028
- Current period not used (min. work days = &1, current = &2) ?The SAP error message
/SAPAPO/PFCS_MESS028
indicates that the current period is not being used in the planning process due to a mismatch in the minimum workdays defined and the current period's workdays. This error typically arises in the context of Advanced Planning and Optimization (APO) within SAP.Cause:
The error message is triggered when the system checks the number of workdays in the current period against the minimum workdays required for planning. The parameters involved are:
&1
): This is the minimum number of workdays that must be available for the planning process to proceed.&2
): This is the number of workdays available in the current period.If the current workdays are less than the minimum required workdays, the system will not allow planning to proceed, resulting in this error message.
To resolve this error, you can take the following steps:
Check the Calendar Settings:
/SAPAPO/MC62
(Maintain Factory Calendar) to ensure that the workdays are set up correctly.Adjust Minimum Workdays:
Change the Planning Period:
Review Planning Parameters:
Consult Documentation:
/SAPAPO/MC62
for factory calendar maintenance and /SAPAPO/MC84
for planning book configuration.By following these steps, you should be able to identify the root cause of the error and implement a suitable solution.
Get instant SAP help. Start your 7-day free trial now.
/SAPAPO/PFCS_MESS027
Forecast run relevance (minimum number of days) not maintained
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
/SAPAPO/PFCS_MESS026
The sum of the weighting factors for trip length &1 is not equal to 100
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
/SAPAPO/PFCS_MESS029
Scaling factor for month not maintained in Customizing
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
/SAPAPO/PFCS_MESS030
Forecast service combination is not supported
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
Click on this link to search all SAP messages.