How To Fix /SAPAPO/PE_APO029 - Error when calculating proc. lead time (vers./prod./loc. &1/&2/&3)


/SAPAPO/PE_APO029 - Overview

  • Message type: E = Error

  • Message class: /SAPAPO/PE_APO -

  • Message number: 029

  • Message text: Error when calculating proc. lead time (vers./prod./loc. &1/&2/&3)

  • Show details Hide details


  • Self-Explanatory Message

    Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.

    To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.

    Unfortunately, there isn't any extra information in this error notice.



    What else can you do?

    First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).

    Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.

    You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.


/SAPAPO/PE_APO029 - Details

  • The SAP error message /SAPAPO/PE_APO029 typically occurs in the context of Advanced Planning and Optimization (APO) when there is an issue with calculating the production lead time for a specific product at a given location. This error can arise due to various reasons, including configuration issues, missing data, or incorrect settings in the system.
    Causes:
    
    Missing Master Data: The error may occur if the necessary master data (like product master, location master, or production resources) is incomplete or missing.
    Incorrect Configuration: If the production lead time settings in the configuration are not set correctly, it can lead to this error.
    Data Inconsistencies: Inconsistencies in the data related to the product, location, or production process can trigger this error.
    Capacity Constraints: If there are capacity constraints or issues with the production resources, it may prevent the calculation of lead times.
    Version Issues: The error may also arise if there are issues with the versioning of the planning

    Already have an account? Login here!




Instant HelpGet instant SAP help. Sign up for our Free Essentials Plan.


/SAPAPO/PE_APO029 - Related SAP Errors

Click on this link to search all SAP messages.


Rating
The AI Support Assistant is great. It provides comprehensive assistance even on the most difficult issues. I highly recommend this service.
Rate 1
John Jordan
SAP Consultant & Author