How To Fix /SAPAPO/PE199 - Start of package creation in method &1, date &2, time &3


/SAPAPO/PE199 - Overview

  • Message type: E = Error

  • Message class: /SAPAPO/PE -

  • Message number: 199

  • Message text: Start of package creation in method &1, date &2, time &3

  • Show details Hide details


  • Self-Explanatory Message

    Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.

    To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.

    Unfortunately, there isn't any extra information in this error notice.



    What else can you do?

    First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).

    Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.

    You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.


/SAPAPO/PE199 - Details

  • The SAP error message /SAPAPO/PE199 typically indicates an issue related to the planning engine in SAP Advanced Planning and Optimization (APO). This message is often associated with problems during the execution of a planning run, such as a background job or a manual planning run.
    
    Cause: The error message /SAPAPO/PE199 can occur due to several reasons, including: Data Issues: There may be inconsistencies or missing data in the master data or transaction data that the planning engine requires to execute the planning run.
    Configuration Issues: Incorrect configuration settings in the APO system, such as planning versions, planning areas, or key figures, can lead to this error. Resource Availability: If the resources required for the planning run are not available or are incorrectly defined, it can cause the planning engine to fail. Locking Issues: If another process is locking the data that the planning engine needs to access, it may not be able to start the package

    Already have an account? Login here!




Instant HelpGet instant SAP help. Sign up for our Free Essentials Plan.


/SAPAPO/PE199 - Related SAP Errors

Click on this link to search all SAP messages.


Rating
ERPlingo's SAP support assistant is amazing. Saves me countless hours trying to solve complex SAP issues myself. It's a real game changer!
Rate 1
Thomas Michael
SAP Consultant, Author & Speaker