Do you have any question about this error?
Message type: E = Error
Message class: /SAPAPO/PDRP_APPR -
Message number: 034
Message text: Start date and end date for planning lock must be set
Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.
To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.
Unfortunately, there isn't any extra information in this error notice.
First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).
Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.
You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.
/SAPAPO/PDRP_APPR034
- Start date and end date for planning lock must be set ?The SAP error message
/SAPAPO/PDRP_APPR034
indicates that there is an issue with the planning lock dates in the Advanced Planning and Optimization (APO) module. Specifically, it means that the start date and end date for the planning lock have not been set, which is necessary for the planning process to proceed.Cause:
- Missing Dates: The planning lock requires both a start date and an end date to define the period during which planning activities are restricted.
- Configuration Issues: There may be a configuration issue in the APO system that prevents the dates from being set correctly.
- User Input Error: The user may have forgotten to input the required dates when initiating the planning process.
Solution:
Set Planning Lock Dates:
- Navigate to the relevant transaction or configuration area where you can set the planning lock dates.
- Ensure that both the start date and end date are specified correctly.
- Save the changes and try to execute the planning process again.
Check Configuration:
- Review the configuration settings in the APO system to ensure that the planning lock settings are correctly defined.
- If necessary, consult with your SAP Basis or APO configuration team to verify that the settings are appropriate for your planning scenario.
User Training:
- If the issue is due to user error, consider providing training or documentation to users on how to properly set the planning lock dates.
Consult Documentation:
- Refer to SAP documentation or help files related to planning locks in APO for more detailed instructions on how to set the dates.
Related Information:
/SAPAPO/DP
(for Demand Planning) or /SAPAPO/SNP
(for Supply Network Planning) to access the planning areas where you can set the dates.By ensuring that the planning lock dates are set correctly, you should be able to resolve the error and continue with your planning activities in SAP APO.
Get instant SAP help. Start your 7-day free trial now.
/SAPAPO/PDRP_APPR033
Planning lock removed
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
/SAPAPO/PDRP_APPR032
Planning lock changed
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
/SAPAPO/PDRP_APPR035
Planning lock created
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
/SAPAPO/PDRP_APPR036
Scheduling agreement delivery schedule not deleted (&1 &2 &3)
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
Click on this link to search all SAP messages.