How To Fix /SAPAPO/PDRP646 - SA line(s) has schedule quantity 0. Sched.Agr: &1/&2.


/SAPAPO/PDRP646 - Overview

  • Message type: E = Error

  • Message class: /SAPAPO/PDRP -

  • Message number: 646

  • Message text: SA line(s) has schedule quantity 0. Sched.Agr: &1/&2.

  • Show details Hide details


  • Self-Explanatory Message

    Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.

    To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.

    Unfortunately, there isn't any extra information in this error notice.



    What else can you do?

    First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).

    Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.

    You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.


/SAPAPO/PDRP646 - Details

  • The SAP error message /SAPAPO/PDRP646 indicates that there are scheduling issues with a specific scheduling agreement (Sched. Agr) in the Advanced Planning and Optimization (APO) module. The message states that the schedule quantity for the specified scheduling agreement line(s) is zero, which can lead to problems in planning and execution.
    
    Cause: Zero Schedule Quantity: The most direct cause of this error is that the schedule quantity for the specified scheduling agreement line(s) is set to zero. This can happen due to various reasons, such as: Incorrect data entry during the creation or modification of the scheduling agreement. Changes in demand or supply that lead to a recalculation resulting in a zero quantity. Deletion or cancellation of planned orders or requirements that affect the scheduling agreement. Planning Parameters: Incorrect planning parameters or settings in the APO system can also lead to this issue. For example, if the planning strategy or forecast settings are not aligned with the

    Already have an account? Login here!




Instant HelpGet instant SAP help. Sign up for our Free Essentials Plan.


/SAPAPO/PDRP646 - Related SAP Errors

Click on this link to search all SAP messages.


Rating
ERPlingo's SAP support assistant is amazing. Saves me countless hours trying to solve complex SAP issues myself. It's a real game changer!
Rate 1
Thomas Michael
SAP Consultant, Author & Speaker