How To Fix /SAPAPO/PDRP509 - Lead time longer than planning horizon (Prod. &1, Loc. &2, Lead time &3)


SAP Error Message - Details

  • Message type: E = Error

  • Message class: /SAPAPO/PDRP -

  • Message number: 509

  • Message text: Lead time longer than planning horizon (Prod. &1, Loc. &2, Lead time &3)

  • Show details Hide details


  • Self-Explanatory Message

    Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.

    To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.

    Unfortunately, there isn't any extra information in this error notice.



    What else can you do?

    First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).

    Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.

    You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.


Smart SAP Assistant

  • What is the cause and solution for SAP error message /SAPAPO/PDRP509 - Lead time longer than planning horizon (Prod. &1, Loc. &2, Lead time &3) ?

    The SAP error message /SAPAPO/PDRP509 indicates that the lead time for a product at a specific location exceeds the planning horizon set in the system. This can occur in the context of Advanced Planning and Optimization (APO) when the system tries to plan production or procurement activities but finds that the lead time for the product is longer than the time frame for which planning is being conducted.

    Cause:

    1. Lead Time Exceeds Planning Horizon: The lead time for the product (in days) is greater than the planning horizon defined in the system. For example, if the planning horizon is set to 30 days and the lead time for the product is 45 days, this error will occur.
    2. Incorrect Configuration: The planning horizon may not be set appropriately based on the business requirements or the lead times of the products.
    3. Data Issues: There may be incorrect or outdated data in the master data for the product or location, leading to discrepancies in lead time calculations.

    Solution:

    1. Adjust Planning Horizon: Review and, if necessary, extend the planning horizon in the system to accommodate the lead time of the product. This can be done in the configuration settings of the APO system.

      • Navigate to the relevant configuration settings in SAP APO and adjust the planning horizon to a value that is greater than the lead time of the product.
    2. Review Lead Time Settings: Check the lead time settings for the product in the material master or the relevant planning book. Ensure that the lead time is accurate and reflects the actual production or procurement time required.

      • Update the lead time if it is incorrectly set or if there have been changes in the production process.
    3. Check Master Data: Ensure that the master data for the product and location is up to date. This includes checking the production lead times, procurement lead times, and any other relevant parameters that may affect planning.

      • If necessary, correct any discrepancies in the master data.
    4. Consult Documentation: Refer to SAP documentation or help resources for further guidance on configuring planning horizons and lead times in APO.

    Related Information:

    • Planning Horizon: This is the time frame within which the planning activities are conducted. It is crucial to set this appropriately based on the business needs and the lead times of the products.
    • Lead Time: This refers to the total time required from the initiation of a process until its completion. In production, it includes setup time, processing time, and any waiting time.
    • APO Configuration: Understanding the configuration settings in SAP APO is essential for effective planning and to avoid such errors. This includes settings related to planning books, data views, and master data.

    By addressing the lead time and planning horizon settings, you can resolve the error and ensure that the planning process runs smoothly.

    • Do you have any question about this error?


      Upgrade now to chat with this error.


Instant HelpGet instant SAP help. Start your 7-day free trial now.


Related SAP Error Messages

Click the links below to see the following related messages:

Click on this link to search all SAP messages.


Rating
ERPlingo's SAP support assistant is amazing. Saves me countless hours trying to solve complex SAP issues myself. It's a real game changer!
Rate 1
Thomas Michael
SAP Consultant, Author & Speaker