Do you have any question about this error?
Message type: E = Error
Message class: /SAPAPO/PDRP -
Message number: 505
Message text: Start date must be less than or equal to the end date
Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.
To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.
Unfortunately, there isn't any extra information in this error notice.
First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).
Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.
You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.
/SAPAPO/PDRP505
- Start date must be less than or equal to the end date ?The SAP error message
/SAPAPO/PDRP505 Start date must be less than or equal to the end date
typically occurs in the context of planning and scheduling within the SAP Advanced Planning and Optimization (APO) module. This error indicates that the start date specified for a planning activity or process is later than the end date, which is logically incorrect.Cause:
- Incorrect Date Input: The most common cause is that the user has entered a start date that is after the end date in the planning transaction or configuration.
- Data Entry Error: This could be due to a simple typographical error when entering dates.
- System Configuration: In some cases, the configuration settings for planning periods or time frames may not align correctly, leading to this error.
Solution:
- Check Date Inputs: Review the start and end dates you have entered. Ensure that the start date is earlier than or equal to the end date.
- Correct the Dates: If you find that the start date is indeed later than the end date, correct it to ensure the logical sequence is maintained.
- Validation: After making changes, validate the inputs again to ensure that the error does not reoccur.
- Consult Documentation: If you are unsure about the correct dates to enter, refer to the relevant SAP documentation or guidelines for the specific planning process you are working on.
- System Configuration Review: If the issue persists, it may be necessary to review the system configuration settings related to planning periods. This may require assistance from an SAP Basis or APO consultant.
Related Information:
/SAPAPO/DP
(Demand Planning) or /SAPAPO/SNP
(Supply Network Planning).By following these steps, you should be able to resolve the error and continue with your planning activities in SAP APO.
Get instant SAP help. Start your 7-day free trial now.
/SAPAPO/PDRP504
Start date is today's date
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
/SAPAPO/PDRP503
Start date cannot be in the past
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
/SAPAPO/PDRP506
Number of periods must be greater than 0
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
/SAPAPO/PDRP507
ID: Enter supplier shutdown time
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
Click on this link to search all SAP messages.