Do you have any question about this error?
Message type: E = Error
Message class: /SAPAPO/PDRP -
Message number: 020
Message text: Result contains errors: Plan. horiz. not &1 months after first demand &2
Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.
To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.
Unfortunately, there isn't any extra information in this error notice.
First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).
Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.
You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.
/SAPAPO/PDRP020
- Result contains errors: Plan. horiz. not &1 months after first demand &2 ?The SAP error message
/SAPAPO/PDRP020 Result contains errors: Plan. horiz. not &1 months after first demand &2
typically occurs in the context of SAP Advanced Planning and Optimization (APO), particularly during the planning process. This error indicates that there is an issue with the planning horizon in relation to the first demand date.Cause:
- Planning Horizon Misalignment: The planning horizon defined in the system does not extend far enough beyond the first demand date. The system expects the planning horizon to be at least a certain number of months (denoted by &1) after the first demand date (denoted by &2).
- Configuration Issues: There may be configuration settings in the APO system that do not align with the demand data or the planning parameters.
- Data Issues: The demand data might be incorrectly set up, or there may be gaps in the data that lead to this error.
Solution:
Adjust Planning Horizon:
- Go to the configuration settings in SAP APO and check the planning horizon settings.
- Ensure that the planning horizon is set to cover at least the required number of months beyond the first demand date.
- You can adjust the planning horizon in the relevant planning book or in the configuration settings for the planning area.
Review Demand Data:
- Check the demand data to ensure that the first demand date is correctly set and that there are no gaps or errors in the demand records.
- If necessary, update the demand data to ensure it aligns with the planning horizon.
Check Configuration Settings:
- Review the configuration settings for the planning area and ensure that they are correctly set up to handle the demand and supply planning processes.
- Make sure that the planning parameters are correctly defined in the APO system.
Run Planning Again:
- After making the necessary adjustments, rerun the planning process to see if the error persists.
Related Information:
/SAPAPO/DP
for demand planning or /SAPAPO/MC
for configuration settings.If the problem persists after trying the above solutions, it may be beneficial to consult with your SAP support team or refer to SAP community forums for additional insights.
Get instant SAP help. Start your 7-day free trial now.
/SAPAPO/PDRP019
Time buckets profile error: &1
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
/SAPAPO/PDRP018
No planning horizon defined at entry location of product &1
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
/SAPAPO/PDRP021
Customizing error for entry/maintenance of historical data: &1
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
/SAPAPO/PDRP022
Invalid scaling factor, parameter: &1 value &2
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
Click on this link to search all SAP messages.