Message type: E = Error
Message class: /SAPAPO/PDEM -
Message number: 500
Message text: Order &1 Item &2 Sched. Line &3 not processed due to an error
Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.
To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.
Unfortunately, there isn't any extra information in this error notice.
First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).
Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.
You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.
The SAP error message /SAPAPO/PDEM500 indicates that there is an issue with processing a specific order, item, or schedule line in the Advanced Planning and Optimization (APO) module. This error can arise from various causes, and understanding the context is crucial for troubleshooting. Here are some common causes, potential solutions, and related information: Causes: Data Inconsistencies: There may be inconsistencies in the master data or transaction data related to the order, item, or schedule line. Missing Master Data: Required master data (like material master, vendor master, etc.) may be missing or incomplete.
Configuration Issues: Incorrect configuration settings in APO or the integration with SAP ERP can lead to processing errors. Locking Issues: The order or item may be locked by another process, preventing it from being processed. Resource Availability: There may be issues related to resource availability, such as capacity constraints or scheduling conflicts. Error in Planning Run: If this error occurs during a planning run, it
Get instant SAP help. Sign up for our Free Essentials Plan.
/SAPAPO/PDEM473 Cannot execute deletion in parallel mode
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
/SAPAPO/PDEM472 Product &1 does not exist at parent location &2 in BOD &3
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
/SAPAPO/PDEM501 Order &1 Item &2 Sched. Line &3 processed successfully
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
/SAPAPO/PDEM502 Process Order &1 Item &2 Sched. Line &3
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
Click on this link to search all SAP messages.