How To Fix /SAPAPO/PCM131 - Order status prohibits splitting of production campaign


/SAPAPO/PCM131 - Overview

  • Message type: E = Error

  • Message class: /SAPAPO/PCM -

  • Message number: 131

  • Message text: Order status prohibits splitting of production campaign

  • Show details Hide details


  • Self-Explanatory Message

    Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.

    To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.

    Unfortunately, there isn't any extra information in this error notice.



    What else can you do?

    First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).

    Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.

    You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.


/SAPAPO/PCM131 - Details

  • The SAP error message /SAPAPO/PCM131 indicates that the order status of a production campaign prohibits the splitting of that campaign. This typically occurs in the context of Advanced Planning and Optimization (APO) within SAP, particularly when dealing with production orders or campaigns that are not allowed to be split due to their current status.
    
    Cause: Order Status: The production campaign or order is in a status that does not allow splitting. For example, if the order is already in production or has been confirmed, it may not be eligible for splitting. Configuration Settings: The system may be configured to prevent splitting for certain types of orders or campaigns based on business rules or settings in the configuration. Dependencies: There may be dependencies or linked orders that prevent the splitting of the campaign.
    Solution: Check Order Status: Review the status of the production campaign. If it is in a status that prohibits splitting (e.g., confirmed, completed), you

    Already have an account? Login here!




Instant HelpGet instant SAP help. Sign up for our Free Essentials Plan.


/SAPAPO/PCM131 - Related SAP Errors

Click on this link to search all SAP messages.


Rating
The AI Support Assistant is great. It provides comprehensive assistance even on the most difficult issues. I highly recommend this service.
Rate 1
John Jordan
SAP Consultant & Author