How To Fix /SAPAPO/PCM127 - Splitting of production campaign completed


/SAPAPO/PCM127 - Overview

  • Message type: E = Error

  • Message class: /SAPAPO/PCM -

  • Message number: 127

  • Message text: Splitting of production campaign completed

  • Show details Hide details


  • Self-Explanatory Message

    Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.

    To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.

    Unfortunately, there isn't any extra information in this error notice.



    What else can you do?

    First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).

    Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.

    You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.


/SAPAPO/PCM127 - Details

  • The SAP error message /SAPAPO/PCM127 typically relates to issues encountered during the splitting of production campaigns in the Advanced Planning and Optimization (APO) module of SAP. This error can occur in various scenarios, particularly when dealing with production planning and scheduling.
    
    Cause: The error message /SAPAPO/PCM127 indicates that the splitting of a production campaign has been completed, but there may be underlying issues that caused the campaign to not split as expected. Common causes include:
    Configuration Issues: Incorrect settings in the campaign management configuration can lead to problems during the splitting process. Capacity Constraints: If there are not enough resources (e.g., machines, labor) available to accommodate the split, the process may fail. Material Availability: Insufficient stock or availability of materials required for the production campaign can prevent successful splitting. Scheduling Conflicts: Conflicts in the production schedule or overlapping campaigns can lead to issues during the splitting process. Data Integrity Issues: Problems with master data (e.g., material master,

    Already have an account? Login here!




Instant HelpGet instant SAP help. Sign up for our Free Essentials Plan.


/SAPAPO/PCM127 - Related SAP Errors

Click on this link to search all SAP messages.


Rating
ERPlingo's SAP support assistant is amazing. Saves me countless hours trying to solve complex SAP issues myself. It's a real game changer!
Rate 1
Thomas Michael
SAP Consultant, Author & Speaker