Message type: E = Error
Message class: /SAPAPO/PCM -
Message number: 116
Message text: Production campaignn &1 "&2" overlaps with planning period boundaries
Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.
To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.
Unfortunately, there isn't any extra information in this error notice.
First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).
Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.
You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.
/SAPAPO/PCM116
- Production campaignn &1 "&2" overlaps with planning period boundaries ?The SAP error message /SAPAPO/PCM116 indicates that there is an issue with a production campaign in SAP Advanced Planning and Optimization (APO). Specifically, the error states that the production campaign overlaps with the planning period boundaries. This can occur when the start or end dates of a production campaign extend beyond the defined planning periods in the system.
Cause: Campaign Dates: The start and end dates of the production campaign are set in such a way that they overlap with the defined planning periods. Planning Period Configuration: The planning periods in the system may not be configured correctly, or they may not align with the production campaign dates. Data Entry Errors: There may be mistakes in the data entry for the production campaign, such as incorrect dates.
Solution: Check Campaign Dates: Review the start and end dates of the production campaign. Ensure that they fall within the defined planning periods. Adjust Planning Periods: If necessary, adjust the
Get instant SAP help. Sign up for our Free Essentials Plan.
/SAPAPO/PCM115
Production campaign &1 "&2" contains a fixed order
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
/SAPAPO/PCM114
Select at least one product
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
/SAPAPO/PCM117
Production campaign &1 "&2" dissolved
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
/SAPAPO/PCM118
No activities found at the resources selected
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
Click on this link to search all SAP messages.