How To Fix /SAPAPO/PALG035 - Date &1 is falls outside the work days defined in calendar &2


/SAPAPO/PALG035 - Overview

  • Message type: E = Error

  • Message class: /SAPAPO/PALG -

  • Message number: 035

  • Message text: Date &1 is falls outside the work days defined in calendar &2

  • Show details Hide details


  • Self-Explanatory Message

    Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.

    To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.

    Unfortunately, there isn't any extra information in this error notice.



    What else can you do?

    First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).

    Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.

    You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.


Smart SAP Assistant

  • What is the cause and solution for SAP error message /SAPAPO/PALG035 - Date &1 is falls outside the work days defined in calendar &2 ?
    The SAP error message /SAPAPO/PALG035 indicates that a specific date falls outside the defined workdays in the calendar associated with the planning area or the specific planning object. This error typically occurs in the context of Advanced Planning and Optimization (APO) when trying to perform operations that require valid working days, such as planning, scheduling, or executing certain transactions.
    
    Cause: Non-Working Days: The date specified in the error message is a non-working day according to the calendar settings in SAP. Calendar Configuration: The calendar assigned to the planning area or the specific object does not include the date in question as a valid working day. Incorrect Date Input: The date being processed may have been incorrectly input or calculated, leading to an invalid date for the context of the operation.
    Solution: Check Calendar Settings: Go to the transaction code SCAL (Maintain Calendar) in SAP. Verify the calendar settings for the relevant planning area or object. Ensure that the

    Already have an account? Login here!




Instant HelpGet instant SAP help. Sign up for our Free Essentials Plan.


Related SAP Error Messages

Click the links below to see the following related messages:

Click on this link to search all SAP messages.


Rating
ERPlingo's SAP support assistant is amazing. Saves me countless hours trying to solve complex SAP issues myself. It's a real game changer!
Rate 1
Thomas Michael
SAP Consultant, Author & Speaker