Do you have any question about this error?
Stop googling SAP errors. Use our Free Essentials plan instead - no credit card needed. Start Now →
Message type: E = Error
Message class: /SAPAPO/PALG -
Message number: 026
Message text: Entry loc. supplied directly and via contract packager (from &1 to &2)
Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.
To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.
Unfortunately, there isn't any extra information in this error notice.
First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).
Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.
You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.
/SAPAPO/PALG026
- Entry loc. supplied directly and via contract packager (from &1 to &2) ?The SAP error message
/SAPAPO/PALG026
indicates that there is a conflict in the supply chain planning process, specifically related to the entry location being supplied both directly and through a contract packager. This typically occurs in the context of Advanced Planning and Optimization (APO) within SAP, where the system is trying to determine how to fulfill a demand for a product.Cause:
The error arises when:
To resolve this error, you can take the following steps:
Review Supply Sources: Check the supply sources for the product in question. Ensure that the configuration for the product does not allow for dual sourcing unless intended.
Adjust Planning Parameters:
Check Contract Packager Settings:
Analyze Demand and Supply:
Consult Documentation: Refer to SAP documentation or help resources for more detailed guidance on managing supply sources and resolving conflicts in APO.
Testing: After making adjustments, run a test planning run to ensure that the error does not reoccur.
/SAPAPO/SDP94
(for demand planning) or /SAPAPO/MC90
(for supply network planning) to analyze and adjust the relevant settings.If the issue persists after following these steps, it may be beneficial to consult with your SAP support team or a consultant who specializes in SAP APO for further assistance.
Get instant SAP help. Sign up for our Free Essentials Plan.
/SAPAPO/PALG025
Time stamp not found in scheduling result: type &1 activity type &2
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
/SAPAPO/PALG024
Error in TSTR_CALC_TIME: SY-SUBRC &1
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
/SAPAPO/PALG027
Source Determination Error: Dest. Loc. &1 Product &2
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
/SAPAPO/PALG028
No SoS ext. refurbishment/KtS (Subc.): LocProd &1 &2, time period &3 - &4
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
Click on this link to search all SAP messages.