Message type: E = Error
Message class: /SAPAPO/PALG -
Message number: 020
Message text: Sequence &1: First validity date &2 not before planning start date &3
Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.
To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.
Unfortunately, there isn't any extra information in this error notice.
First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).
Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.
You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.
/SAPAPO/PALG020
- Sequence &1: First validity date &2 not before planning start date &3 ?The SAP error message /SAPAPO/PALG020 indicates that there is an issue with the validity dates of a sequence in the Advanced Planning and Optimization (APO) module. Specifically, the error states that the first validity date of a sequence is not before the planning start date.
Cause: This error typically occurs when: The sequence's first validity date is set to a date that is equal to or later than the planning start date. There may be a configuration or data entry error where the dates were not set correctly. The planning start date is incorrectly defined in the planning book or in the settings.
Solution: To resolve this error, you can take the following steps: Check the Validity Dates: Go to the sequence definition in the APO system. Verify the first validity date of the sequence and ensure it is set to a date that is earlier than the planning start date. Adjust the Planning Start Date: If the first validity date
Get instant SAP help. Sign up for our Free Essentials Plan.
/SAPAPO/PALG019
Missing lane: from &1 to &2, source loc. Product &3
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
/SAPAPO/PALG018
TPOP indicator set at change of BOD (location &1 product &2)
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
/SAPAPO/PALG021
Sched. outside of calendar limits: timestr. ID &1 start &2 dir. &3 sec &4
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
/SAPAPO/PALG022
Initial entry time stamp for scheduling request with index &1
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
Click on this link to search all SAP messages.