How To Fix /SAPAPO/PAGT_HEUR200 - Max. no. of periods for scheduling < no. of periods for PPM/PDS switch!


/SAPAPO/PAGT_HEUR200 - Overview

  • Message type: E = Error

  • Message class: /SAPAPO/PAGT_HEUR -

  • Message number: 200

  • Message text: Max. no. of periods for scheduling < no. of periods for PPM/PDS switch!

  • Show details Hide details


  • Self-Explanatory Message

    Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.

    To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.

    Unfortunately, there isn't any extra information in this error notice.



    What else can you do?

    First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).

    Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.

    You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.


/SAPAPO/PAGT_HEUR200 - Details

  • The SAP error message /SAPAPO/PAGT_HEUR200 indicates that there is a mismatch between the maximum number of periods allowed for scheduling and the number of periods defined in the Production Planning Master Data (PPM) or the Production Data Structure (PDS). This typically occurs in the context of Advanced Planning and Optimization (APO) when trying to run a heuristic or planning run.
    
    Cause: Configuration Mismatch: The maximum number of periods for scheduling defined in the APO system is less than the number of periods specified in the PPM or PDS. Heuristic Settings: The heuristic you are trying to execute may be configured to consider more periods than what is allowed in the scheduling settings. Data Entry Error: There may be an error in the data entry for the PPM or PDS, leading to an inconsistency in the number of periods.
    Solution: Adjust Maximum Number of Periods: Go to the APO system and check the settings for the maximum number

    Already have an account? Login here!




Instant HelpGet instant SAP help. Sign up for our Free Essentials Plan.


/SAPAPO/PAGT_HEUR200 - Related SAP Errors

Click on this link to search all SAP messages.


Rating
ERPlingo simplifies finding the accurate answers to SAP message errors. I now use every week. A must have tool for anyone working with SAP! Highly recommended!
Rate 1
Kent Bettisworth
Executive SAP Consultant