Do you have any question about this error?
Message type: E = Error
Message class: /SAPAPO/PAGT_HEUR -
Message number: 120
Message text: Scheduling errors occured while infinite scheduling
Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.
To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.
Unfortunately, there isn't any extra information in this error notice.
First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).
Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.
You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.
/SAPAPO/PAGT_HEUR120
- Scheduling errors occured while infinite scheduling ?The SAP error message
/SAPAPO/PAGT_HEUR120
indicates that there were scheduling errors during the infinite scheduling process in SAP Advanced Planning and Optimization (APO). This error typically arises when the system encounters issues while trying to schedule production orders or planned orders based on the available resources, capacities, or constraints.Causes:
- Resource Constraints: The resources (e.g., machines, labor) may not have enough capacity to handle the scheduled orders.
- Order Conflicts: There may be conflicts between orders, such as overlapping production times or incompatible products being scheduled on the same resource.
- Missing Master Data: Incomplete or incorrect master data (e.g., material master, resource master) can lead to scheduling issues.
- Capacity Planning Issues: Incorrect capacity planning settings or parameters can cause the system to miscalculate available capacity.
- Time Period Issues: The scheduling horizon may not be set correctly, leading to scheduling attempts outside of the available time frame.
- Configuration Issues: Incorrect configuration in the APO system or in the heuristics used for scheduling can lead to errors.
Solutions:
- Check Resource Availability: Review the capacity of the resources involved in the scheduling process. Ensure that they have enough capacity to handle the planned orders.
- Review Order Overlaps: Check for any overlapping orders that may be causing conflicts. Adjust the scheduling of these orders as necessary.
- Validate Master Data: Ensure that all relevant master data is complete and accurate. This includes checking material masters, resource masters, and any other relevant data.
- Adjust Capacity Planning Settings: Review and adjust the capacity planning settings in the system to ensure they align with the actual production capabilities.
- Examine Scheduling Horizon: Make sure that the scheduling horizon is set correctly and that the orders are being scheduled within this timeframe.
- Check Heuristic Configuration: Review the configuration of the heuristics being used for scheduling. Ensure that they are set up correctly and are appropriate for the specific scheduling scenario.
- Run the Heuristic in Simulation Mode: If possible, run the heuristic in simulation mode to identify specific issues without affecting live data.
Related Information:
/SAPAPO/MC90
to access the planning book and analyze the data related to the scheduling.By following these steps, you should be able to identify the root cause of the scheduling errors and implement the necessary solutions to resolve them.
Get instant SAP help. Start your 7-day free trial now.
/SAPAPO/PAGT_HEUR119
Final deallocation of infinite scheduled orders has started
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
/SAPAPO/PAGT_HEUR118
Start of final infinite scheduling of failed orders
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
/SAPAPO/PAGT_HEUR121
Finite scheduling of reexploded orders
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
/SAPAPO/PAGT_HEUR122
Shift determination process started
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
Click on this link to search all SAP messages.