Do you have any question about this error?
Message type: E = Error
Message class: /SAPAPO/PAGT_HEUR -
Message number: 037
Message text: All valid periods processed without solution
Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.
To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.
Unfortunately, there isn't any extra information in this error notice.
First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).
Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.
You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.
/SAPAPO/PAGT_HEUR037
- All valid periods processed without solution ?The SAP error message
/SAPAPO/PAGT_HEUR037: All valid periods processed without solution
typically occurs in the context of SAP Advanced Planning and Optimization (APO) when running heuristics or optimization processes. This message indicates that the planning run was unable to find a feasible solution for the given planning parameters across all valid periods.Causes:
- Insufficient Capacity: The resources or production capacities may not be sufficient to meet the demand for the specified periods.
- Constraints: There may be constraints defined in the system (like resource availability, production limits, or material availability) that prevent the planner from finding a feasible solution.
- Incorrect Planning Parameters: The planning parameters set for the heuristic run may not be appropriate, leading to infeasibility.
- Data Issues: There could be issues with master data (like incorrect resource definitions, missing materials, or incorrect planning versions) that affect the planning run.
- Demand and Supply Mismatch: The demand may exceed the available supply, or there may be no supply available to meet the demand.
Solutions:
- Check Capacity and Resources: Review the capacity of the resources involved in the planning run. Ensure that they are sufficient to meet the demand.
- Review Constraints: Analyze the constraints set in the system. If they are too restrictive, consider adjusting them to allow for more flexibility in the planning process.
- Adjust Planning Parameters: Revisit the planning parameters used in the heuristic run. Ensure they are set correctly and are appropriate for the current planning scenario.
- Validate Master Data: Check the master data for any inconsistencies or missing information. Ensure that all relevant data (materials, resources, etc.) is correctly defined and available.
- Analyze Demand and Supply: Review the demand and supply data to identify any mismatches. If demand exceeds supply, consider adjusting the demand or increasing supply.
- Run Alternative Heuristics: If the current heuristic is not yielding results, consider running alternative heuristics or optimization methods that may be more suitable for the scenario.
Related Information:
/SAPAPO/HEUR
to run heuristics or /SAPAPO/DP
for demand planning to analyze the planning run.By following these steps, you should be able to identify the cause of the error and implement a solution to resolve it.
Get instant SAP help. Start your 7-day free trial now.
/SAPAPO/PAGT_HEUR036
Enter mandatory parameter 'Maximum number of periods backwards'
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
/SAPAPO/PAGT_HEUR035
Error while reexplosion of order &1 using PPM/PDS &2
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
/SAPAPO/PAGT_HEUR038
Target period &1 not included in period grid
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
/SAPAPO/PAGT_HEUR039
Maximum limit of scheduling attempts reached - Infinite scheduling
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
Click on this link to search all SAP messages.