How To Fix /SAPAPO/PAGT_HEUR009 - Application error while scheduling occured (e.g. plg. intervals violated)


/SAPAPO/PAGT_HEUR009 - Overview

  • Message type: E = Error

  • Message class: /SAPAPO/PAGT_HEUR -

  • Message number: 009

  • Message text: Application error while scheduling occured (e.g. plg. intervals violated)

  • Show details Hide details


  • Self-Explanatory Message

    Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.

    To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.

    Unfortunately, there isn't any extra information in this error notice.



    What else can you do?

    First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).

    Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.

    You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.


/SAPAPO/PAGT_HEUR009 - Details

  • The SAP error message /SAPAPO/PAGT_HEUR009 typically indicates that there was an application error during the scheduling process in SAP Advanced Planning and Optimization (APO). This error often arises when there are violations of planning intervals or constraints that prevent the scheduling heuristic from successfully completing its task.
    Causes:
    
    Planning Interval Violations: The scheduling heuristic may be trying to schedule production or procurement activities that fall outside of the defined planning intervals.
    Resource Constraints: There may be insufficient resources (e.g., machines, labor) available to meet the demand within the specified time frame.
    Incorrect Master Data: Issues with master data, such as incorrect production versions, resource availability, or capacity settings, can lead to scheduling errors.
    
    Configuration Issues: Incorrect settings in the planning area or heuristic configuration can also cause this error. Data Inconsistencies: Inconsistencies in the data, such as overlapping orders or incorrect lead times, can lead to scheduling conflicts. Solutions: Check Planning Intervals: Review the planning intervals defined in

    Already have an account? Login here!




Instant HelpGet instant SAP help. Sign up for our Free Essentials Plan.


/SAPAPO/PAGT_HEUR009 - Related SAP Errors

Click on this link to search all SAP messages.


Rating
ERPlingo simplifies finding the accurate answers to SAP message errors. I now use every week. A must have tool for anyone working with SAP! Highly recommended!
Rate 1
Kent Bettisworth
Executive SAP Consultant