How To Fix /SAPAPO/PAGT_HEUR005 - Error by creation of period (day/week)


/SAPAPO/PAGT_HEUR005 - Overview

  • Message type: E = Error

  • Message class: /SAPAPO/PAGT_HEUR -

  • Message number: 005

  • Message text: Error by creation of period (day/week)

  • Show details Hide details


  • Self-Explanatory Message

    Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.

    To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.

    Unfortunately, there isn't any extra information in this error notice.



    What else can you do?

    First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).

    Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.

    You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.


/SAPAPO/PAGT_HEUR005 - Details

  • The SAP error message /SAPAPO/PAGT_HEUR005 typically occurs in the context of SAP Advanced Planning and Optimization (APO) when there is an issue related to the creation of planning periods, such as days or weeks. This error can arise due to various reasons, including configuration issues, data inconsistencies, or system settings.
    Cause
    
    Incorrect Configuration: The planning area or the planning version may not be configured correctly, leading to issues when creating periods.
    Data Inconsistencies: There may be inconsistencies in the master data or transaction data that prevent the system from creating the required periods.
    Locking Issues: If another process is locking the planning area or the relevant data, it may lead to this error.
    Time Period Overlap: Attempting to create periods that overlap with existing periods can also trigger this error.
    Missing Authorizations: Lack of necessary authorizations for the user trying to create the periods can lead to this error.
    
    Solution
    
    Check Configuration: Review the configuration of the planning

    Already have an account? Login here!




Instant HelpGet instant SAP help. Sign up for our Free Essentials Plan.


/SAPAPO/PAGT_HEUR005 - Related SAP Errors

Click on this link to search all SAP messages.


Rating
The AI Support Assistant is great. It provides comprehensive assistance even on the most difficult issues. I highly recommend this service.
Rate 1
John Jordan
SAP Consultant & Author