How To Fix /SAPAPO/OUTLDET109 - Event to be created would start earlier than history horizon


/SAPAPO/OUTLDET109 - Overview

  • Message type: E = Error

  • Message class: /SAPAPO/OUTLDET -

  • Message number: 109

  • Message text: Event to be created would start earlier than history horizon

  • Show details Hide details


  • Self-Explanatory Message

    Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.

    To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.

    Unfortunately, there isn't any extra information in this error notice.



    What else can you do?

    First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).

    Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.

    You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.


/SAPAPO/OUTLDET109 - Details

  • The SAP error message /SAPAPO/OUTLDET109 indicates that an event you are trying to create in the SAP Advanced Planning and Optimization (APO) system is scheduled to start earlier than the defined history horizon. This typically occurs in the context of planning and forecasting, where the system has a defined period for historical data that it uses to make predictions or plan future events.
    
    Cause: History Horizon Configuration: The history horizon is a time frame set in the system that defines how far back the system can look for historical data. If you attempt to create an event that starts before this horizon, the system will throw this error. Event Scheduling: The event you are trying to create may have been scheduled incorrectly, leading to a start time that is outside the permissible range defined by the history horizon.
    Solution: Adjust the History Horizon: You can extend the history horizon in the configuration settings of your APO

    Already have an account? Login here!




Instant HelpGet instant SAP help. Sign up for our Free Essentials Plan.


/SAPAPO/OUTLDET109 - Related SAP Errors

Click on this link to search all SAP messages.


Rating
ERPlingo simplifies finding the accurate answers to SAP message errors. I now use every week. A must have tool for anyone working with SAP! Highly recommended!
Rate 1
Kent Bettisworth
Executive SAP Consultant