Do you have any question about this error?
Message type: E = Error
Message class: /SAPAPO/OPT_SEQ_STA -
Message number: 018
Message text: Optimization completed without solution
Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.
To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.
Unfortunately, there isn't any extra information in this error notice.
First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).
Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.
You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.
/SAPAPO/OPT_SEQ_STA018
- Optimization completed without solution ?The SAP error message
/SAPAPO/OPT_SEQ_STA018
indicates that an optimization run in SAP Advanced Planning and Optimization (APO) has completed, but no feasible solution was found. This can occur in various scenarios, particularly in supply chain planning and production scheduling.Causes:
- Insufficient Resources: There may not be enough resources (e.g., machines, labor) available to meet the demand.
- Conflicting Constraints: Constraints set in the planning run (like capacity constraints, time constraints, or material availability) may be too strict, preventing any feasible solution.
- Incorrect Master Data: Issues with master data, such as incorrect product configurations, resource definitions, or planning parameters, can lead to infeasibility.
- Demand and Supply Mismatch: The demand may exceed the supply capabilities, leading to no feasible solution.
- Planning Version Issues: The planning version being used may not be correctly set up or may have been changed, leading to inconsistencies.
- Optimization Settings: The settings used for the optimization run may not be appropriate for the current planning scenario.
Solutions:
- Review Constraints: Check the constraints defined in the planning run. Consider relaxing some constraints to allow for a feasible solution.
- Check Master Data: Verify that all relevant master data (materials, resources, production versions, etc.) is accurate and complete.
- Analyze Demand and Supply: Ensure that the demand is aligned with the available supply. Adjust forecasts or production plans as necessary.
- Adjust Planning Parameters: Review and adjust the planning parameters and settings used in the optimization run.
- Run Feasibility Check: Before running the optimization, perform a feasibility check to identify potential issues.
- Use Alternative Planning Versions: If applicable, try using a different planning version that may have more appropriate settings or data.
- Consult Logs and Messages: Review the logs and messages generated during the optimization run for additional insights into what might have gone wrong.
Related Information:
/SAPAPO/OPTIMIZE
to access optimization runs and /SAPAPO/MC90
for checking master data.By systematically addressing the potential causes and applying the suggested solutions, you should be able to resolve the error and achieve a feasible optimization solution.
Get instant SAP help. Start your 7-day free trial now.
/SAPAPO/OPT_SEQ_STA017
Optimization of the individual lines
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
/SAPAPO/OPT_SEQ_STA016
Optimization of the entire line network
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
/SAPAPO/OPT_SEQ_STA019
Optimization completed with a partial solution
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
/SAPAPO/OPT_SEQ_STA020
Time limit reached
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
Click on this link to search all SAP messages.