Message type: E = Error
Message class: /SAPAPO/OPT_DPS_EXP -
Message number: 390
Message text: End of optimization horizon
Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.
To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.
Unfortunately, there isn't any extra information in this error notice.
First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).
Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.
You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.
/SAPAPO/OPT_DPS_EXP390
- End of optimization horizon ?The SAP error message
/SAPAPO/OPT_DPS_EXP390
with the description "End of optimization horizon" typically occurs in the context of SAP Advanced Planning and Optimization (APO) when the optimization process reaches the end of the defined planning horizon. This can happen during the execution of a planning run, such as a heuristic or optimization run, where the system is unable to process any further due to the defined limits of the planning horizon.Cause:
- Planning Horizon Configuration: The planning horizon may be set too short, causing the optimization process to reach its limit before completing the necessary calculations.
- Data Issues: There may be issues with the data being processed, such as missing or incorrect data that prevents the optimization from proceeding.
- Optimization Settings: The settings for the optimization run may not be configured correctly, leading to premature termination of the process.
- Resource Constraints: If the resources or capacities are not defined properly, the optimization may not be able to extend beyond the current horizon.
Solution:
- Extend the Planning Horizon: Review and extend the planning horizon settings in the APO system. This can typically be done in the configuration settings for the planning area or the specific planning run.
- Check Data Integrity: Ensure that all necessary master data (e.g., product, location, resource) and transaction data (e.g., demand, supply) are complete and accurate.
- Review Optimization Settings: Check the settings for the optimization run to ensure they are appropriate for the planning scenario. This includes reviewing the heuristics or optimization algorithms being used.
- Monitor Resource Definitions: Ensure that all resources and capacities are defined correctly in the system. This includes checking for any constraints that may limit the optimization process.
- Run a Test Optimization: If possible, run a test optimization with a smaller dataset or a shorter time frame to identify if the issue persists.
Related Information:
/SAPAPO/OPTIMIZE
or /SAPAPO/DP
to access the relevant planning runs and settings.By addressing the configuration and data integrity issues, you should be able to resolve the /SAPAPO/OPT_DPS_EXP390
error and successfully complete your optimization runs.
Get instant SAP help. Start your 7-day free trial now.
/SAPAPO/OPT_DPS_EXP367
Deallocation due to deallocated predecessor
What causes this issue? The operation has a deallocated predecessor and is therefore deallocated as well, according to the optimization profile setti...
/SAPAPO/OPT_DPS_EXP366
Deallocation due to delay
What causes this issue? Due to a lack of capacity of a resource, the system would schedule the operation too late. The system therefore deallocates t...
/SAPAPO/OPT_DPS_EXP391
End of Validity
What causes this issue? The operation is deallocated because of a validity range. The end of the validity range is the latest time at which the opera...
/SAPAPO/OPT_DPS_EXP392
Latest date/time for operation to be on time
What causes this issue? The operation can only be scheduled with a delay. The time specified is the latest time at which the operation would be on ti...