How To Fix /SAPAPO/OPT_DPS_EXP365 - Deallocation due to delay caused by lack of capacity


/SAPAPO/OPT_DPS_EXP365 - Overview

  • Message type: E = Error

  • Message class: /SAPAPO/OPT_DPS_EXP -

  • Message number: 365

  • Message text: Deallocation due to delay caused by lack of capacity

  • Show details Hide details


  • Self-Explanatory Message

    Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.

    To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.

    Unfortunately, there isn't any extra information in this error notice.



    What else can you do?

    First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).

    Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.

    You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.


/SAPAPO/OPT_DPS_EXP365 - Details

  • The SAP error message /SAPAPO/OPT_DPS_EXP365 indicates that there is a deallocation of planned orders or production orders in the Advanced Planning and Optimization (APO) module due to delays caused by a lack of capacity. This typically occurs in the context of production planning and scheduling when the system cannot allocate the necessary resources (like machines or labor) to meet the planned production schedule.
    Causes:
    
    Insufficient Capacity: The most common cause is that the available capacity of the resources (work centers, machines, etc.) is less than what is required to fulfill the planned orders.
    Overlapping Orders: If multiple orders are scheduled to run simultaneously on the same resource, it can lead to capacity conflicts.
    Incorrect Capacity Planning: If the capacity of resources is not correctly defined in the system, it can lead to miscalculations in the planning process.
    Changes in Demand: Sudden changes in demand or order priorities can lead to a situation where the existing

    Already have an account? Login here!




Instant HelpGet instant SAP help. Sign up for our Free Essentials Plan.


/SAPAPO/OPT_DPS_EXP365 - Related SAP Errors

Click on this link to search all SAP messages.


Rating
The AI Support Assistant is great. It provides comprehensive assistance even on the most difficult issues. I highly recommend this service.
Rate 1
John Jordan
SAP Consultant & Author