How To Fix /SAPAPO/OPT_DPS_EXP334 - Delay due to subsequent capacity conflict


SAP Error Message - Details

  • Message type: E = Error

  • Message class: /SAPAPO/OPT_DPS_EXP -

  • Message number: 334

  • Message text: Delay due to subsequent capacity conflict

  • Show details Hide details


  • Self-Explanatory Message

    Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.

    To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.

    Unfortunately, there isn't any extra information in this error notice.



    What else can you do?

    First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).

    Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.

    You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.


Smart SAP Assistant

  • What is the cause and solution for SAP error message /SAPAPO/OPT_DPS_EXP334 - Delay due to subsequent capacity conflict ?

    The SAP error message /SAPAPO/OPT_DPS_EXP334 indicates a delay in the scheduling of a production order or a planned order due to a subsequent capacity conflict. This typically occurs in the Advanced Planning and Optimization (APO) module when the system identifies that the required capacity for a specific operation cannot be fulfilled due to existing commitments or constraints on the resources.

    Cause:

    1. Capacity Constraints: The resource (work center, machine, etc.) has already been allocated to other orders, leading to insufficient capacity for the new order.
    2. Scheduling Conflicts: The order being scheduled overlaps with other orders that are already planned or in production.
    3. Resource Availability: The resource may not be available due to maintenance, breakdowns, or other operational issues.
    4. Incorrect Master Data: Issues with the configuration of the work center, such as incorrect capacity settings or availability periods.

    Solution:

    1. Review Capacity Planning: Check the capacity utilization of the affected work center. You can do this using transaction codes like CM01 (Capacity Overview) or CM21 (Capacity Leveling).
    2. Adjust Scheduling: If possible, reschedule the conflicting orders to free up capacity for the new order. This can be done in the planning board or through the order management interface.
    3. Modify Order Parameters: If the order can be adjusted, consider changing the start date, end date, or quantity to alleviate the conflict.
    4. Increase Capacity: If the resource is consistently overbooked, consider increasing its capacity by adding shifts, overtime, or additional resources.
    5. Check Master Data: Ensure that the work center and resource master data are correctly configured, including capacity, availability, and any relevant production constraints.
    6. Use Alternative Resources: If applicable, consider using alternative resources that can handle the production requirements without causing conflicts.

    Related Information:

    • Transaction Codes: Familiarize yourself with relevant transaction codes such as CM01, CM21, MD04 (Stock/Requirements List), and MD02 (MDM - MRP Run).
    • Capacity Planning: Understand the principles of capacity planning in SAP APO, including how to set up and manage work centers and production resources.
    • APO Configuration: Review the configuration settings in APO related to production planning and scheduling, including the settings for heuristics and optimization strategies.
    • Documentation: Refer to SAP Help documentation for detailed explanations of capacity planning and scheduling concepts in APO.

    By addressing the underlying causes of the capacity conflict and implementing the suggested solutions, you should be able to resolve the error and proceed with your planning activities.

    • Do you have any question about this error?


      Upgrade now to chat with this error.


Instant HelpGet instant SAP help. Start your 7-day free trial now.


Related SAP Error Messages

Click the links below to see the following related messages:

Click on this link to search all SAP messages.


Rating
ERPlingo simplifies finding the accurate answers to SAP message errors. I now use every week. A must have tool for anyone working with SAP! Highly recommended!
Rate 1
Kent Bettisworth
Executive SAP Consultant