Do you have any question about this error?
Message type: E = Error
Message class: /SAPAPO/OO_TR -
Message number: 478
Message text: Horizon was set to max. value of 9999 days
Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.
To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.
Unfortunately, there isn't any extra information in this error notice.
First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).
Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.
You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.
/SAPAPO/OO_TR478
- Horizon was set to max. value of 9999 days ?The SAP error message
/SAPAPO/OO_TR478 Horizon was set to max. value of 9999 days
typically occurs in the context of SAP Advanced Planning and Optimization (APO) when the planning horizon for a particular planning area or process is set to an excessively high value, exceeding the system's limits.Cause:
- Excessive Planning Horizon: The planning horizon has been configured to a value greater than the maximum allowed limit of 9999 days. This can happen due to incorrect settings in the planning area or during the configuration of the planning process.
- Configuration Errors: The error may arise from incorrect configuration in the APO system, where the planning horizon is not set appropriately for the business requirements.
- Data Migration Issues: If data has been migrated from another system, the planning horizon settings may not have been adjusted correctly.
Solution:
Adjust the Planning Horizon:
- Navigate to the configuration settings for the relevant planning area in SAP APO.
- Check the settings for the planning horizon and adjust it to a value less than or equal to 9999 days.
- This can typically be done in the transaction code
/SAPAPO/MC62
(for planning areas) or through the relevant customizing transactions.Review Planning Parameters:
- Ensure that all planning parameters are set correctly and are aligned with the business requirements.
- Check if there are any specific settings for the planning horizon in the relevant planning books or data views.
Consult Documentation:
- Review SAP documentation or notes related to planning horizons in APO to ensure compliance with best practices.
Testing:
- After making changes, perform tests to ensure that the planning process runs without errors and that the new settings meet business needs.
Related Information:
If the issue persists after making the necessary adjustments, it may be beneficial to consult with an SAP expert or support team for further assistance.
Get instant SAP help. Start your 7-day free trial now.
/SAPAPO/OO_TR477
Max. calcul. proc. lead time (399,999:99 hours) exceeded for product &1
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
/SAPAPO/OO_TR476
Max. lead time pull exceeded for means of transport &1 (<400.000 h)
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
/SAPAPO/OO_TR479
Procurement lead time set to maximum value of 399,999:59 hours
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
/SAPAPO/OO_TR480
Only a maximum horizon of 399,999:59 hours is allowed
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
Click on this link to search all SAP messages.