How To Fix /SAPAPO/OM_UPGRADE196 - Res. &1, Loc. &2, PlVer. &3: Activities in the past. Set 'days-' to &4.


SAP Error Message - Details

  • Message type: E = Error

  • Message class: /SAPAPO/OM_UPGRADE -

  • Message number: 196

  • Message text: Res. &1, Loc. &2, PlVer. &3: Activities in the past. Set 'days-' to &4.

  • Show details Hide details


  • Self-Explanatory Message

    Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.

    To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.

    Unfortunately, there isn't any extra information in this error notice.



    What else can you do?

    First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).

    Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.

    You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.


Smart SAP Assistant

  • What is the cause and solution for SAP error message /SAPAPO/OM_UPGRADE196 - Res. &1, Loc. &2, PlVer. &3: Activities in the past. Set 'days-' to &4. ?

    The SAP error message /SAPAPO/OM_UPGRADE196 typically occurs in the context of SAP Advanced Planning and Optimization (APO) when there are issues related to planning activities that are scheduled in the past. This error message indicates that there are activities (such as production orders, planned orders, or other planning objects) that are set to occur in a time frame that has already passed, which is not allowed in the planning process.

    Cause:

    The error message is triggered when:

    • There are planning objects (like orders or activities) that have dates or times set in the past.
    • The system is trying to process these objects, but the planning horizon does not allow for past activities.
    • The configuration for the planning horizon or the settings for the planning process may not be correctly set, leading to this error.

    Solution:

    To resolve this error, you can take the following steps:

    1. Check the Dates of Activities: Review the planning objects (e.g., production orders, planned orders) associated with the resource and location mentioned in the error message. Ensure that their start and end dates are set in the future.

    2. Adjust Planning Horizon: If necessary, adjust the planning horizon settings in the system. This can typically be done in the configuration settings for the planning area or the specific planning book you are using.

    3. Set 'days-' Parameter: The error message suggests setting the 'days-' parameter to a specific value (indicated by &4 in the message). This parameter controls how far back the planning process can look. You may need to adjust this parameter to allow for a wider planning horizon.

    4. Reprocess the Planning Run: After making the necessary adjustments, reprocess the planning run to see if the error persists.

    5. Consult Documentation: Refer to SAP documentation or notes related to this specific error message for additional context and troubleshooting steps.

    6. Contact SAP Support: If the issue persists after trying the above solutions, consider reaching out to SAP support for further assistance.

    Related Information:

    • Planning Horizon: This is a critical concept in SAP APO that defines the time frame within which planning activities are considered. It is important to configure this correctly to avoid issues with past activities.
    • SAP Notes: Check for any relevant SAP Notes that may provide additional insights or patches related to this error.
    • Transaction Codes: Familiarize yourself with relevant transaction codes in SAP APO that can help you analyze and adjust planning settings (e.g., /SAPAPO/MC90 for planning book settings).

    By following these steps, you should be able to identify the root cause of the error and implement a solution to resolve it.

    • Do you have any question about this error?


      Upgrade now to chat with this error.


Instant HelpGet instant SAP help. Start your 7-day free trial now.


Related SAP Error Messages

Click the links below to see the following related messages:

Click on this link to search all SAP messages.


Rating
ERPlingo simplifies finding the accurate answers to SAP message errors. I now use every week. A must have tool for anyone working with SAP! Highly recommended!
Rate 1
Kent Bettisworth
Executive SAP Consultant