How To Fix /SAPAPO/OM_TS216 - Value of constraint is smaller than set flow (SNP)


SAP Error Message - Details

  • Message type: E = Error

  • Message class: /SAPAPO/OM_TS -

  • Message number: 216

  • Message text: Value of constraint is smaller than set flow (SNP)

  • Show details Hide details


  • Self-Explanatory Message

    Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.

    To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.

    Unfortunately, there isn't any extra information in this error notice.



    What else can you do?

    First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).

    Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.

    You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.


Smart SAP Assistant

  • What is the cause and solution for SAP error message /SAPAPO/OM_TS216 - Value of constraint is smaller than set flow (SNP) ?

    The SAP error message /SAPAPO/OM_TS216 Value of constraint is smaller than set flow (SNP) typically occurs in the context of Supply Network Planning (SNP) within SAP Advanced Planning and Optimization (APO). This error indicates that the value of a constraint (such as a resource capacity or a demand constraint) is less than the flow that has been calculated for that constraint, which means that the planning process cannot satisfy the demand or the constraints defined in the planning model.

    Causes:

    1. Insufficient Capacity: The most common cause is that the capacity of a resource (e.g., production capacity, storage capacity) is not sufficient to meet the planned flow of products.
    2. Incorrect Constraints: There may be incorrect or overly restrictive constraints defined in the planning model, leading to conflicts with the calculated flows.
    3. Data Inconsistencies: Inconsistencies in master data (like resource availability, production rates, etc.) can lead to this error.
    4. Planning Version Issues: If there are multiple planning versions, the version being used may not have the correct data or settings.
    5. Demand and Supply Mismatch: A mismatch between demand and supply can also trigger this error, especially if the demand exceeds the available supply.

    Solutions:

    1. Review Resource Capacities: Check the capacity settings for the resources involved. Ensure that they are set correctly and can accommodate the planned flows.
    2. Adjust Constraints: Review and adjust the constraints defined in the planning model. Make sure they are realistic and aligned with the actual capabilities of the resources.
    3. Check Master Data: Verify the master data for accuracy. Ensure that all relevant data (like production rates, lead times, etc.) is correctly maintained.
    4. Analyze Demand and Supply: Conduct a thorough analysis of the demand and supply situation. Adjust the planning parameters or production schedules as necessary to align them.
    5. Use Planning Books: Utilize planning books to analyze the planning results and identify where the constraints are being violated.
    6. Run the Planning Process Again: After making adjustments, re-run the planning process to see if the error persists.

    Related Information:

    • Transaction Codes: You may use transaction codes like /SAPAPO/SDP94 (for SNP planning) or /SAPAPO/OM17 (for checking constraints) to analyze the planning results and constraints.
    • SAP Notes: Check for any relevant SAP Notes that may address specific issues related to this error message.
    • Documentation: Refer to SAP documentation for detailed information on SNP and constraint management.

    If the issue persists after trying the above solutions, it may be beneficial to consult with an SAP APO expert or reach out to SAP support for further assistance.

    • Do you have any question about this error?


      Upgrade now to chat with this error.


Instant HelpGet instant SAP help. Start your 7-day free trial now.


Related SAP Error Messages

Click the links below to see the following related messages:

Click on this link to search all SAP messages.


Rating
ERPlingo simplifies finding the accurate answers to SAP message errors. I now use every week. A must have tool for anyone working with SAP! Highly recommended!
Rate 1
Kent Bettisworth
Executive SAP Consultant