Do you have any question about this error?
Stop googling SAP errors. Use our Free Essentials plan instead - no credit card needed. Start Now →
Message type: E = Error
Message class: /SAPAPO/OM_TS -
Message number: 208
Message text: Time shift too short (SNP)
Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.
To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.
Unfortunately, there isn't any extra information in this error notice.
First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).
Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.
You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.
/SAPAPO/OM_TS208
- Time shift too short (SNP) ?The SAP error message
/SAPAPO/OM_TS208 Time shift too short (SNP)
typically occurs in the context of the SAP Advanced Planning and Optimization (APO) module, specifically within the Supply Network Planning (SNP) component. This error indicates that the time shift defined for a planning run is shorter than what is required for the specific planning scenario.Cause:
- Time Shift Configuration: The time shift defined in the SNP planning run is not sufficient to accommodate the planning horizon or the requirements of the planning process.
- Planning Horizon: The planning horizon set in the SNP profile may be longer than the time shift defined, leading to this error.
- Master Data Issues: There may be issues with the master data, such as incorrect lead times or planning parameters that do not align with the defined time shift.
Solution:
- Adjust Time Shift: Increase the time shift in the SNP planning run configuration. This can be done in the SNP profile settings where you define the planning parameters.
- Review Planning Horizon: Ensure that the planning horizon set in the SNP profile is appropriate for the business requirements and aligns with the time shift.
- Check Master Data: Review the master data settings, including transportation lead times, production lead times, and any other relevant parameters that may affect the planning process.
- Run Planning with Different Parameters: If necessary, try running the planning process with different parameters to see if the error persists.
Related Information:
/SAPAPO/SDP94
(for SNP planning) or /SAPAPO/MC90
(for planning book) to access the relevant settings.If the problem persists after making the necessary adjustments, it may be beneficial to consult with your SAP Basis or APO functional team for further investigation.
Get instant SAP help. Sign up for our Free Essentials Plan.
/SAPAPO/OM_TS206
SNP rule not valid (SNP)
What causes this issue? The calculation rules used while creating an SNP relation do not correspond to the specifications. This problem is due to an...
/SAPAPO/OM_TS205
SNP relation does not exist (SNP)
What causes this issue? You can only delete a time change when all SNP relations that refer to it have been deleted beforehand. However, such SNP rel...
/SAPAPO/OM_TS209
Cycle found in delta graph (SNP)
What causes this issue? A cycle was discovered in the SNP networking structure. This problem is due to an error in creation of the SNP net in the app...
/SAPAPO/OM_TS210
Inconsistent constraint (SNP)
What causes this issue? An inconsistency was discovered within the SNP propagation module. This problem is due to an internal liveCache application ...
Click on this link to search all SAP messages.