Do you have any question about this error?
Message type: E = Error
Message class: /SAPAPO/OM_PVC_TS -
Message number: 017
Message text: Node ID is initial
Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.
To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.
Unfortunately, there isn't any extra information in this error notice.
First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).
Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.
You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.
/SAPAPO/OM_PVC_TS017
- Node ID is initial ?The SAP error message
/SAPAPO/OM_PVC_TS017 Node ID is initial
typically occurs in the context of SAP Advanced Planning and Optimization (APO), particularly when dealing with the Production Planning and Detailed Scheduling (PP/DS) module. This error indicates that a required Node ID is not specified or is missing in the context of a planning run or a specific operation.Cause:
- Missing Node ID: The most common cause of this error is that the Node ID, which is essential for the planning process, has not been defined or is not being passed correctly in the planning function or process.
- Incorrect Configuration: There may be issues with the configuration of the planning object structures or the master data related to the nodes in the supply chain.
- Data Integrity Issues: There could be inconsistencies or missing data in the master data that is required for the planning process.
Solution:
Check Node Configuration:
- Ensure that the Node ID is correctly defined in the relevant master data (e.g., in the location or resource master data).
- Verify that the node is active and properly configured in the APO system.
Review Planning Object Structures:
- Check the planning object structures to ensure that the Node ID is included and correctly mapped.
- Make sure that the planning run or function you are executing is set up to use the correct Node ID.
Validate Master Data:
- Review the master data for any inconsistencies or missing entries related to the nodes.
- Ensure that all necessary data is maintained in the system, including resources, locations, and any other relevant entities.
Debugging:
- If you have access to debugging tools, you can trace the execution of the planning function to identify where the Node ID is being set or why it is not being passed correctly.
Consult Documentation:
- Refer to SAP documentation or notes related to the specific version of APO you are using for any known issues or additional troubleshooting steps.
Contact SAP Support:
- If the issue persists after checking the above points, consider reaching out to SAP support for further assistance, providing them with detailed information about the error and the context in which it occurs.
Related Information:
/SAPAPO/MC90
for planning book maintenance or /SAPAPO/OM_PVC
for planning-related functions.By following these steps, you should be able to identify and resolve the issue related to the /SAPAPO/OM_PVC_TS017 Node ID is initial
error message.
Get instant SAP help. Start your 7-day free trial now.
/SAPAPO/OM_PVC_TS016
Timegrid ID is initial
What causes this issue? You specified an initial guid for the ID of a time grid at function module /SAPAPO/PVC_TS_MASTER. This is not allowed.System ...
/SAPAPO/OM_PVC_TS015
Cvc must be updated
What causes this issue? A CVC of a planning area to be copied is not up to date in the source planversion. But the planning areas to be copied must b...
/SAPAPO/OM_PVC_TS018
Invalid value for copy all parameter
What causes this issue? You specified an invalid value for the copy all parameter at function module /SAPAPO/OM_PVC_TS_MASTER. Allowed values are: Do...
/SAPAPO/OM_PVC_TS019
Invalid value for restrict master data creation parameter
What causes this issue? You specified an invalid value for the restricted master data creation parameter at function module /SAPAPO/OM_PVC_TS_MASTER....
Click on this link to search all SAP messages.