How To Fix /SAPAPO/OM_PVC_TS010 - Timegrid or keyfigure horizon has been changed during pvc


SAP Error Message - Details

  • Message type: E = Error

  • Message class: /SAPAPO/OM_PVC_TS -

  • Message number: 010

  • Message text: Timegrid or keyfigure horizon has been changed during pvc

  • Show details Hide details


  • Self-Explanatory Message

    Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.

    To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.

    Unfortunately, there isn't any extra information in this error notice.



    What else can you do?

    First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).

    Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.

    You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.


Smart SAP Assistant

  • What is the cause and solution for SAP error message /SAPAPO/OM_PVC_TS010 - Timegrid or keyfigure horizon has been changed during pvc ?

    The SAP error message /SAPAPO/OM_PVC_TS010 typically occurs in the context of SAP Advanced Planning and Optimization (APO) when there is a mismatch or inconsistency in the time grid or key figure horizon during the planning process. This error is often related to the Planning Version Control (PVC) functionality in SAP APO.

    Cause:

    1. Time Grid Changes: The time grid (the intervals of time defined for planning) or the key figure horizon (the range of time for which data is available) has been altered while the planning process is ongoing. This can happen if:

      • The planning version is modified.
      • The time series data is updated or changed.
      • There are inconsistencies in the configuration of the planning area.
    2. Data Consistency Issues: If there are changes in the underlying data or configuration that affect the time grid or key figure horizon, it can lead to this error.

    3. Concurrent Processes: If multiple users or processes are trying to access or modify the same planning version or data simultaneously, it can lead to conflicts.

    Solution:

    1. Check Configuration: Review the configuration of the planning area and ensure that the time grid and key figure horizons are correctly defined and consistent.

    2. Avoid Concurrent Changes: Ensure that no other users or processes are modifying the planning version or related data while you are performing your planning activities.

    3. Restart the Planning Process: If the error occurs, try to restart the planning process. This may involve:

      • Exiting the planning session.
      • Re-entering the planning transaction.
      • Re-running the planning function.
    4. Review Change Logs: Check the change logs for any recent modifications to the planning version or time grid settings that may have caused the issue.

    5. Consult Documentation: Refer to SAP documentation or notes related to the specific version of SAP APO you are using for any known issues or patches that may address this error.

    6. Contact SAP Support: If the issue persists and you cannot identify the cause, consider reaching out to SAP support for assistance. Provide them with detailed information about the error, including the steps leading up to it and any relevant configuration settings.

    Related Information:

    • SAP Notes: Search for relevant SAP Notes in the SAP Support Portal that may address this specific error or provide guidance on best practices for managing planning versions and time grids.
    • SAP Community: Engage with the SAP Community forums to see if other users have encountered similar issues and what solutions they have found.
    • Training and Documentation: Ensure that users involved in planning activities are adequately trained on the use of SAP APO and the implications of changing planning configurations.

    By following these steps, you should be able to diagnose and resolve the error related to the time grid or key figure horizon changes during the PVC process in SAP APO.

    • Do you have any question about this error?


      Upgrade now to chat with this error.


Instant HelpGet instant SAP help. Start your 7-day free trial now.


Related SAP Error Messages

Click the links below to see the following related messages:

Click on this link to search all SAP messages.


Rating
ERPlingo simplifies finding the accurate answers to SAP message errors. I now use every week. A must have tool for anyone working with SAP! Highly recommended!
Rate 1
Kent Bettisworth
Executive SAP Consultant