How To Fix /SAPAPO/OM_PVC_BASE022 - Invalid operation before PPDS_MASTER


/SAPAPO/OM_PVC_BASE022 - Overview

  • Message type: E = Error

  • Message class: /SAPAPO/OM_PVC_BASE -

  • Message number: 022

  • Message text: Invalid operation before PPDS_MASTER

  • Show details Hide details


  • Self-Explanatory Message

    Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.

    To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.

    Unfortunately, there isn't any extra information in this error notice.



    What else can you do?

    First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).

    Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.

    You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.


/SAPAPO/OM_PVC_BASE022 - Details

  • The SAP error message /SAPAPO/OM_PVC_BASE022 Invalid operation before PPDS_MASTER typically occurs in the context of SAP Advanced Planning and Optimization (APO), particularly when working with the Production Planning and Detailed Scheduling (PPDS) module. This error indicates that an operation is being attempted that is not valid before the PPDS master data has been properly initialized or set up.
    
    Cause: Missing Initialization: The PPDS master data has not been initialized or is incomplete. This can happen if the necessary master data (like resources, production versions, etc.) has not been created or activated. Incorrect Sequence of Operations: The operation being performed is not allowed at the current stage of the process. For example, trying to execute a planning run or scheduling operation before the PPDS master data is ready.
    Configuration Issues: There may be configuration issues in the APO system that prevent the proper functioning of PPDS.
    Solution: Check PPDS Master Data: Ensure that all necessary PPDS master

    Already have an account? Login here!




Instant HelpGet instant SAP help. Sign up for our Free Essentials Plan.


/SAPAPO/OM_PVC_BASE022 - Related SAP Errors

Click on this link to search all SAP messages.


Rating
The AI Support Assistant is great. It provides comprehensive assistance even on the most difficult issues. I highly recommend this service.
Rate 1
John Jordan
SAP Consultant & Author