Do you have any question about this error?
Message type: E = Error
Message class: /SAPAPO/OM_ERROR2 -
Message number: 422
Message text: For RPM order, a resource used in multiple activities
Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.
To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.
Unfortunately, there isn't any extra information in this error notice.
First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).
Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.
You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.
/SAPAPO/OM_ERROR2422
- For RPM order, a resource used in multiple activities ?The SAP error message
/SAPAPO/OM_ERROR2422
typically indicates that there is a conflict in resource allocation for a Resource Planning Management (RPM) order. This error occurs when a resource is being used in multiple activities simultaneously, which is not allowed due to the resource's capacity constraints.Cause:
- Resource Overlap: The same resource is assigned to multiple activities that are scheduled to occur at the same time.
- Capacity Constraints: The resource may have limited capacity, and the planned activities exceed this capacity.
- Incorrect Scheduling: The scheduling of activities may not have taken into account the availability of the resource.
Solution:
- Check Resource Allocation: Review the activities scheduled for the resource in question. Ensure that no two activities are scheduled to use the same resource at the same time.
- Adjust Scheduling: If there are overlapping activities, consider rescheduling one or more of them to avoid conflicts.
- Increase Resource Capacity: If feasible, increase the capacity of the resource to accommodate the planned activities.
- Use Alternative Resources: If possible, assign alternative resources to some of the activities to alleviate the conflict.
- Review Planning Parameters: Check the planning parameters and settings in the system to ensure they are configured correctly for resource allocation.
Related Information:
/SAPAPO/OM
to analyze the order management and resource allocation.If the issue persists after trying the above solutions, it may be beneficial to consult with your SAP support team or refer to SAP Notes for any specific patches or updates related to this error.
Get instant SAP help. Start your 7-day free trial now.
/SAPAPO/OM_ERROR2421
RPM order must have at least one activity with modes
INCLUDE /SAPAPO/OM_ERROR_GENERAL OBJECT DOKU ID TXError message extract from SAP system. Copyright SAP SE. ...
/SAPAPO/OM_ERROR2420
iPPE ID of an RPM order must point to liveCache iPPE
INCLUDE /SAPAPO/OM_ERROR_GENERAL OBJECT DOKU ID TXError message extract from SAP system. Copyright SAP SE. ...
/SAPAPO/OM_ERROR2423
RPM order must have exactly one master output node
INCLUDE /SAPAPO/OM_ERROR_GENERAL OBJECT DOKU ID TXError message extract from SAP system. Copyright SAP SE. ...
/SAPAPO/OM_ERROR2424
ORDER_MODIFY used to create/delete master output node
INCLUDE /SAPAPO/OM_ERROR_GENERAL OBJECT DOKU ID TXError message extract from SAP system. Copyright SAP SE. ...
Click on this link to search all SAP messages.