How To Fix /SAPAPO/OM_ERROR2351 - Confirmation activity: end time smaller than remaining start time


/SAPAPO/OM_ERROR2351 - Overview

  • Message type: E = Error

  • Message class: /SAPAPO/OM_ERROR2 -

  • Message number: 351

  • Message text: Confirmation activity: end time smaller than remaining start time

  • Show details Hide details


  • Self-Explanatory Message

    Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.

    To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.

    Unfortunately, there isn't any extra information in this error notice.



    What else can you do?

    First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).

    Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.

    You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.


Smart SAP Assistant

  • What is the cause and solution for SAP error message /SAPAPO/OM_ERROR2351 - Confirmation activity: end time smaller than remaining start time ?
    The SAP error message /SAPAPO/OM_ERROR2351 indicates that there is a conflict in the scheduling of activities within the Advanced Planning and Optimization (APO) module. Specifically, the error states that the end time of a confirmation activity is smaller than the remaining start time, which means that the system is trying to confirm an activity that cannot logically occur because its end time is before the start time of the remaining activities.
    
    Cause: Incorrect Time Entries: The confirmation activity may have been entered with incorrect time values, leading to a situation where the end time is set before the start time of the next scheduled activity. Scheduling Conflicts: There may be overlapping activities or scheduling conflicts that have not been resolved, causing the system to generate this error. Data Inconsistencies: There could be inconsistencies in the master data or transaction data that affect the scheduling of activities. Resource Availability: The resources assigned to the activity may

    Already have an account? Login here!




Instant HelpGet instant SAP help. Sign up for our Free Essentials Plan.


Related SAP Error Messages

Click the links below to see the following related messages:

Click on this link to search all SAP messages.


Rating
ERPlingo simplifies finding the accurate answers to SAP message errors. I now use every week. A must have tool for anyone working with SAP! Highly recommended!
Rate 1
Kent Bettisworth
Executive SAP Consultant