Message type: E = Error
Message class: /SAPAPO/OM_ERROR2 -
Message number: 339
Message text: Two constraints that exclude each other or create unrealizable situation
Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.
To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.
Unfortunately, there isn't any extra information in this error notice.
First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).
Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.
You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.
/SAPAPO/OM_ERROR2339
- Two constraints that exclude each other or create unrealizable situation ?The SAP error message /SAPAPO/OM_ERROR2339 indicates that there are two constraints in your planning model that are mutually exclusive or create an unrealizable situation. This typically occurs in the context of Advanced Planning and Optimization (APO) within SAP, particularly when dealing with planning scenarios that involve constraints on resources, production, or demand.
Cause: Conflicting Constraints: The most common cause of this error is that there are constraints defined in the planning model that cannot coexist. For example, if one constraint requires a resource to be available at a certain time while another constraint requires that same resource to be unavailable at that same time, this will lead to an unrealizable situation. Inconsistent Data: Sometimes, the data used in the planning model may be inconsistent or incorrect, leading to conflicting constraints. This can happen if there are changes in the master data or if the planning parameters are not set correctly. Logical Errors in Planning:
Get instant SAP help. Sign up for our Free Essentials Plan.
/SAPAPO/OM_ERROR2338
The iPPE object for the order was deleted
INCLUDE /SAPAPO/OM_ERROR_GENERAL OBJECT DOKU ID TXError message extract from SAP system. Copyright SAP SE. ...
/SAPAPO/OM_ERROR2337
Mode linkage problem with mode number
What causes this issue? An application program called an LCA routine and the following error occurred: An order has at least one condition with mode ...
/SAPAPO/OM_ERROR2340
Keep activity dates for setup activities where no valid end time entered
INCLUDE /SAPAPO/OM_ERROR_GENERAL OBJECT DOKU ID TXError message extract from SAP system. Copyright SAP SE. ...
/SAPAPO/OM_ERROR2341
Old and new setup activity logic mixed together
INCLUDE /SAPAPO/OM_ERROR_GENERAL OBJECT DOKU ID TXError message extract from SAP system. Copyright SAP SE. ...
Click on this link to search all SAP messages.