How To Fix /SAPAPO/OM_ERROR2066 - Unscheduled break > 100%


SAP Error Message - Details

  • Message type: E = Error

  • Message class: /SAPAPO/OM_ERROR2 -

  • Message number: 066

  • Message text: Unscheduled break > 100%

  • Show details Hide details


  • Self-Explanatory Message

    Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.

    To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.

    Unfortunately, there isn't any extra information in this error notice.



    What else can you do?

    First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).

    Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.

    You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.


Smart SAP Assistant

  • What is the cause and solution for SAP error message /SAPAPO/OM_ERROR2066 - Unscheduled break > 100% ?

    The SAP error message /SAPAPO/OM_ERROR2066 indicates that there is an issue with the scheduling of production orders or operations in the Advanced Planning and Optimization (APO) module. Specifically, it refers to an "unscheduled break" that exceeds 100%. This typically means that the system has detected a situation where the planned breaks or downtimes for a production operation are not aligned with the available capacity, leading to an over-allocation of time.

    Cause:

    1. Capacity Constraints: The production capacity defined in the system may not be sufficient to handle the planned operations, leading to excessive unscheduled breaks.
    2. Incorrect Break Definitions: The breaks or downtimes defined in the production process may be incorrectly set, resulting in an unrealistic scheduling scenario.
    3. Resource Availability: Resources (machines, labor, etc.) may not be available as planned, causing the system to allocate more time for breaks than is feasible.
    4. Planning Parameters: The planning parameters for the production order may not be set correctly, leading to miscalculations in scheduling.

    Solution:

    1. Review Capacity Planning: Check the capacity of the resources involved in the production process. Ensure that the available capacity is sufficient to meet the demand.
    2. Adjust Break Definitions: Review and adjust the definitions of breaks and downtimes in the production process. Ensure that they are realistic and aligned with actual operational practices.
    3. Check Resource Availability: Verify the availability of resources and ensure that they are correctly defined in the system. If there are any discrepancies, update the resource availability accordingly.
    4. Re-evaluate Planning Parameters: Review the planning parameters for the production order. Make necessary adjustments to ensure that they reflect the actual production environment.
    5. Run Capacity Check: Perform a capacity check in the APO system to identify any bottlenecks or issues with resource allocation.
    6. Consult Documentation: Refer to SAP documentation or support notes related to this error for additional insights and troubleshooting steps.

    Related Information:

    • Transaction Codes: You may use transaction codes like /SAPAPO/CC01 (Capacity Check) or /SAPAPO/OM01 (Order Management) to analyze and manage production orders and capacity.
    • SAP Notes: Check for any relevant SAP Notes that may address this specific error or provide additional guidance on capacity planning and scheduling.
    • Training and Support: If the issue persists, consider reaching out to SAP support or consulting with a specialist in SAP APO for further assistance.

    By addressing the underlying causes and implementing the suggested solutions, you should be able to resolve the error and improve the scheduling of production operations in your SAP system.

    • Do you have any question about this error?


      Upgrade now to chat with this error.


Instant HelpGet instant SAP help. Start your 7-day free trial now.


Related SAP Error Messages

Click the links below to see the following related messages:

Click on this link to search all SAP messages.


Rating
ERPlingo's SAP support assistant is amazing. Saves me countless hours trying to solve complex SAP issues myself. It's a real game changer!
Rate 1
Thomas Michael
SAP Consultant, Author & Speaker