Do you have any question about this error?
Message type: E = Error
Message class: /SAPAPO/OM_ERROR -
Message number: 364
Message text: Invalid confirmed start time of an activity
Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.
To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.
Unfortunately, there isn't any extra information in this error notice.
First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).
Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.
You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.
/SAPAPO/OM_ERROR364
- Invalid confirmed start time of an activity ?The SAP error message
/SAPAPO/OM_ERROR364
indicates that there is an issue with the confirmed start time of an activity in the Advanced Planning and Optimization (APO) module. This error typically arises when the system detects that the confirmed start time for an activity is invalid, which can occur due to various reasons.Causes:
- Incorrect Time Settings: The confirmed start time may fall outside the permissible time range defined in the planning parameters.
- Resource Availability: The resource assigned to the activity may not be available at the confirmed start time, leading to a conflict.
- Scheduling Conflicts: There may be overlapping activities or constraints that prevent the activity from starting at the confirmed time.
- Data Inconsistencies: There could be inconsistencies in the master data, such as incorrect lead times, production versions, or routing information.
- Changes in Demand or Supply: Changes in demand or supply can lead to a recalculation of schedules, resulting in invalid confirmed times.
Solutions:
- Check Activity Details: Review the details of the activity in question, including the confirmed start time, and ensure that it aligns with the planning parameters.
- Resource Availability Check: Verify the availability of the resources assigned to the activity. Adjust the scheduling or resource allocation as necessary.
- Adjust Scheduling Parameters: If the confirmed start time is outside the permissible range, consider adjusting the scheduling parameters or constraints to allow for the activity to be scheduled correctly.
- Review Master Data: Ensure that all relevant master data (e.g., production versions, routing, lead times) is accurate and up to date.
- Recalculate the Schedule: If there have been changes in demand or supply, recalculate the schedule to reflect the new conditions.
- Consult Logs and Messages: Check the system logs and other error messages for additional context that may help identify the root cause of the issue.
Related Information:
/SAPAPO/OM_ORDER
to view and manage orders and activities in APO.If the issue persists after following these steps, it may be beneficial to consult with your SAP support team or a technical consultant who specializes in SAP APO for further assistance.
Get instant SAP help. Start your 7-day free trial now.
/SAPAPO/OM_ERROR363
Invalid input/output offset types of an activity
What causes this issue? An application program called an LCA routine. The following error occurred: Invalid value for field /SAPAPO/IO_OFFSET_TYPE of...
/SAPAPO/OM_ERROR362
Invalid change made to pegging area of an input/output node
What causes this issue? An application program called an LCA routine. The following error occurred: The attempt to change the pegging area of an inpu...
/SAPAPO/OM_ERROR365
Invalid times for dummy activities
What causes this issue? An application program called an LCA routine. The following error occurred: Time interval is not valid for dummy activities. ...
/SAPAPO/OM_ERROR366
Invalid specification for block limit scheduling
What causes this issue? An application program called an LCA routine. The following error occurred: /SAPAPO/OM_BCK_LIMITS_MODE as part of /SAPAPO/OM_...
Click on this link to search all SAP messages.